Laserfiche WebLink
March 2014 Stonewall Springs — QA/QC Plan <br />Table # 1 Monitoring/Test Methods <br />Item <br />Factor to be <br />Test Procedure <br />Test Method <br />Minimum Test <br />Monitored <br />Reference <br />Frequency* <br />Water <br />Quality <br />ASTM C 94 <br />Prior to <br />construction <br />Cement <br />Physical /Chemical <br />ASTM C 150 <br />Manufacturers <br />Properties <br />ASTM C 1157 <br />certification or <br />prequalified <br />Pozzolan /Flyash <br />Physical /Chemical <br />ASTM C 618 or <br />Manufacturer's <br />Properties <br />equivalent <br />certification or <br />prequalified <br />Admixtures <br />Chemical <br />ASTM C 494 <br />Manufacturer's <br />Properties <br />ASTM C 260 <br />certification <br />Aggregates <br />Quality <br />ASTM C 33 <br />At initial project <br />start, 1 /week to <br />1 /month thereafter, <br />depending on <br />history with source <br />Aggregates <br />Specific Gravity, <br />ASTM C 127 <br />At initial project <br />Absorption <br />ASTM C 128 <br />start, 1 /week to <br />1 /month thereafter, <br />depending on <br />history with source <br />Aggregates <br />Grading <br />ASTM C 117 <br />1/500 tons of <br />Soil Cement <br />ASTM C 136 <br />delivery or <br />production <br />Aggregates <br />Moisture Content <br />ASTM C 566 <br />Before each shift <br />ASTM C 70 <br />and as required <br />Aggregates <br />Flat/Long Particles <br />ASTM D 4791 <br />1 /month as <br />required <br />Aggregates <br />Atterberg Limits <br />ASTM D 4318 <br />1/week <br />Soil Cement <br />Consistency and <br />ASTM D 1170 <br />1 /day or as <br />Density <br />required <br />Soil Cement <br />In -Place Density <br />ASTM C 1040 <br />2 /shift or 2 /lift, <br />whichever is <br />sooner <br />Soil Cement <br />Mix Aggregate <br />ASTM C 117 <br />1/2500 cy of RCC <br />Gradations <br />ASTM C 136 <br />placement <br />Soil Cement <br />Oven -Dry Moisture <br />ASTM C 566 <br />1/5000 cy or to <br />verify nuclear <br />density test <br />Soil Cement <br />Mixture Proportions <br />Each batch ticket <br />or each 10 minutes <br />for continuous flow <br />mixing plants <br />is <br />