My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-04-09_PERMIT FILE - M2000041
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2000041
>
2014-04-09_PERMIT FILE - M2000041
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:30:11 PM
Creation date
4/10/2014 11:18:42 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000041
IBM Index Class Name
PERMIT FILE
Doc Date
4/9/2014
Doc Name
Response to Third Adequacy AM01
From
EAI
To
DRMS
Type & Sequence
AM1
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
March 2014 Stonewall Springs — QA/QC Plan <br />Upon completion of the project, the CQA Engineer will prepare the CQA Final Report. This report will be <br />the final record of the Construction Quality Assurance information for the site. In general, the report shall <br />include all submittal items discussed in this CQA Plan. This shall include, at a minimum: <br />• A brief completion report describing activities, deviations from design and material specifications, <br />and quality of work. <br />• Field notes and reports from the installation procedure, including such information as weather and <br />unusual circumstances. <br />• Summary tables of results for soils testing. <br />• Compilation of copies of photo documentation. <br />• The results of all soils testing, including both in situ field testing and laboratory testing in an <br />appendix. <br />• A set of as- constructed drawings sealed by the Engineer of Record. The drawings must show <br />confirmation survey points and elevations. <br />The report shall also provide a narrative description, in general, of the site's construction, noting all <br />unusual occurrences encountered (i.e., failed seams, extreme weather, etc.). This report will be stamped <br />by a Registered Professional Engineer to certify construction was completed in general accordance with <br />approved design drawings, special provisions and other applicable contract documents, with exceptions <br />noted. This report shall be provided to the Engineer of Record shortly after the completion of work. <br />15 <br />