My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-04-09_PERMIT FILE - M2000041
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2000041
>
2014-04-09_PERMIT FILE - M2000041
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:30:11 PM
Creation date
4/10/2014 11:18:42 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000041
IBM Index Class Name
PERMIT FILE
Doc Date
4/9/2014
Doc Name
Response to Third Adequacy AM01
From
EAI
To
DRMS
Type & Sequence
AM1
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
March 2014 Stonewall Springs — QA/QC Plan <br />Provisions, and any applicable regulatory requirements. Quality assurance can either be <br />provided by the State, or their designated representative, which is often an independent <br />consulting, engineering, or construction management firm. Although quality assurance is as <br />important during all phases of the project, construction quality assurance is often in association <br />with those actions taken in relation to the installation of the geosynthetic materials, installation of <br />piping materials, and the placement and compaction of the soils materials. Implementation of the <br />CQA Plan is a critical component of a project because field conditions are the most variable and <br />the most difficult to control and documentation is being recognized as invaluable. <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.