Laserfiche WebLink
Proposed 2014 Disturbances: <br />Proposed operations for 2014 at Site 4 on the Ute and Site 13 on the Qui -Buc No. 1 will be <br />opened for approximately 0.4 acre. Upon completion, sites will be closed and reseeded. <br />Proposed 2014 Reclamation: <br />Upon completion of sites opened during 2014, approximately 0.4 acre will be closed and <br />reseeded. If the site on the Ute remains open, it will be made safe for winter. <br />Sufficiency of Bond: <br />A reclamation bond of $ 6,231 was renewed and set aside in February 2013 to cover annual <br />operations and disturbances under this mining permit. Additionally, a bond for $11,190 covering <br />roads for this operation and two other operations is set aside with the U.S.F.S. <br />Reubmitted, <br />JC(SEPH L. DORRIS 1 Attch. <br />operator, Crystaljack Mining Site maps <br />