Laserfiche WebLink
plan also describes the procedural aspects of removal, storage, redistribution, and testing of topsoil <br />materials. <br />As of the submittal of PR -08, all mining areas east of 2700 Road have been backfilled, topsoiled <br />and seeded according to the requirements of the approved permit. Large portions of this area have <br />been granted Phase 1 and Phase 2 bond release. The majority of this area has been restored to <br />Irrigated Pasture with excellent productivity. Topsoil erosion has been extremely low due to the <br />vegetation present. No topsoil redistribution for the areas east of 2700 Road have been affected <br />by the changes present in PR -08. <br />August 2013 (PR -08) 2.05.4(2)(d) -2 <br />