My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-09-26_REVISION - C1981008 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981008
>
2013-09-26_REVISION - C1981008 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:31:40 PM
Creation date
3/28/2014 7:28:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
Revision
Doc Date
9/26/2013
Doc Name
Permit Page Edits - Topsoil 2.05.4(2)(d)
Type & Sequence
PR8
Email Name
DAB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
plan also describes the procedural aspects of removal, storage, redistribution, and testing of topsoil <br />materials. <br />As of the submittal of PR -08, all mining areas east of 2700 Road have been backfilled, topsoiled <br />and seeded according to the requirements of the approved permit. Large portions of this area have <br />been granted Phase 1 and Phase 2 bond release. The majority of this area has been restored to <br />Irrigated Pasture with excellent productivity. Topsoil erosion has been extremely low due to the <br />vegetation present. No topsoil redistribution for the areas east of 2700 Road have been affected <br />by the changes present in PR -08. <br />August 2013 (PR -08) 2.05.4(2)(d) -2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.