My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-09-26_REVISION - C1981008 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981008
>
2013-09-26_REVISION - C1981008 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:31:40 PM
Creation date
3/28/2014 7:28:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
Revision
Doc Date
9/26/2013
Doc Name
Permit Page Edits - Topsoil 2.05.4(2)(d)
Type & Sequence
PR8
Email Name
DAB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 2.05.4(2)(d) <br />Topsoil Handling, Stockpiling and Redistribution <br />1.0 Introduction <br />All predicted topsoil salvage information is located in e Section 2.04.9 Soils Resource <br />Information. As of the submittal of PR -08, all topsoil from the site has been stripped. Much of the <br />topsoil stripped from areas west of 2700 Road has been placed in various stockpiles. Actual topsoil <br />salvaged has been measured in all the stockpiles and a full volume balance has been made for the <br />proposed redistribution of soil. The topsoil handling and stockpiling requirements of Rule 2.05.3(5) <br />are addressed in this ep rmit Section 2.05.4(2)(d). All topsoil replacement information is also in this <br />sails. <br />L2ermit Section. Prime farmland specifics (Rule 4.25 satisfaction) of topsoil handling are found in <br />permit Section /. . <br />This section outlines WFC's plan for removal, storage and redistribution of topsoil, subsoils and <br />other material, to meet the requirement of SeetionRule 4.06. The plan addresses those <br />reclamation activities that are conducted during and immediately after backfilling and grading <br />(Section 2.05.4(2)(c)), but prior to revegetation (Section 2.05.4(2)(e)). The objectives of the plan <br />are to reconstruct plant growth and aquifer mediums that are capable of supporting the postmining <br />land uses. The plan presents an account of the plant growth material and aquifer medium <br />requirements based upon current and projected disturbance acreage and plant growth material and <br />aquifer medium availability based on topsoil depth mapping and overburden assessments. The <br />August 2013 (PR -08) 2.05.4(2)(d) -1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.