Laserfiche WebLink
Section 2.05.4(2)(d) <br />Topsoil Handling, Stockpiling and Redistribution <br />1.0 Introduction <br />All predicted topsoil salvage information is located in e Section 2.04.9 Soils Resource <br />Information. As of the submittal of PR -08, all topsoil from the site has been stripped. Much of the <br />topsoil stripped from areas west of 2700 Road has been placed in various stockpiles. Actual topsoil <br />salvaged has been measured in all the stockpiles and a full volume balance has been made for the <br />proposed redistribution of soil. The topsoil handling and stockpiling requirements of Rule 2.05.3(5) <br />are addressed in this ep rmit Section 2.05.4(2)(d). All topsoil replacement information is also in this <br />sails. <br />L2ermit Section. Prime farmland specifics (Rule 4.25 satisfaction) of topsoil handling are found in <br />permit Section /. . <br />This section outlines WFC's plan for removal, storage and redistribution of topsoil, subsoils and <br />other material, to meet the requirement of SeetionRule 4.06. The plan addresses those <br />reclamation activities that are conducted during and immediately after backfilling and grading <br />(Section 2.05.4(2)(c)), but prior to revegetation (Section 2.05.4(2)(e)). The objectives of the plan <br />are to reconstruct plant growth and aquifer mediums that are capable of supporting the postmining <br />land uses. The plan presents an account of the plant growth material and aquifer medium <br />requirements based upon current and projected disturbance acreage and plant growth material and <br />aquifer medium availability based on topsoil depth mapping and overburden assessments. The <br />August 2013 (PR -08) 2.05.4(2)(d) -1 <br />