Laserfiche WebLink
2: Extraction Plan Map, and will be identified in the field with posts tops <br />painted in day - glowed orange, forming line of site markers along the <br />critical area extent of the extraction limits at those locations. All <br />extracted slopes will meet the specifications consistent with the AWES <br />report. <br />It is our understanding consistent with the AWES determinations, a safety <br />factor 1.3 or greater for the slopes as specified within the critical areas, <br />that the good faith notifications are acceptable to the OMLR, as previously <br />submitted. Two additional Acknowledgements of our commitment for <br />owners of structures arrived after the notification due date and are <br />included for your records. Also included is the agreement with The <br />Greeley Irrigation Ditch Company pertaining to the planned relocation of <br />the ditch segment. <br />6.5 Geotechnical Stability Exhibit <br />26. The Division's engineering staff reviewed the slope stability analysis <br />report included with the Varra -Coulson site dated .Tune 27, 2013. A copy <br />of the review memo from TC Wait is attached. <br />The correspondence from AWES, LLC dated January 13, 2014 did not <br />respond to the memo from TC Wait dated October 17, 2013. <br />Please refer to correspondence from AWES of 23 March 2014. <br />27. thru 28. The responses are adequate. <br />Acknowledged. <br />Please be advised the Varra - Coulson Resource Project application may be <br />deemed inadequate, and the application may be denied on March 4, 2014, unless <br />the above mentioned adequacy review items are addressed to the satisfaction of <br />the Division. If more time is needed to complete the reply, the Division can <br />grant an extension to the decision date. This will be done upon receipt of a <br />written waiver of the Applicant's right to a decision by March 4, 2014 and <br />request for additional time. This must be received no later than the deadline <br />date. <br />Varra Companies, Inc. Coulson Resource Project OMLR M- 2013 -064 14 <br />Correspondence to Peter Hays 23 March 2014 <br />