Laserfiche WebLink
Page 2 of 2 <br />4. Please submit an updated Map 120 and Map 147 showing the current extent of the <br />developed entries and mined longwall panels as per Rule 4.20. <br />5. Please update Table 11.13-1 on page 11.13-11 to accurately reflect the current amount of <br />recoverable raw and clean coal reserves to the date of this renewal. <br />6. Reviewing Table V -4: Topsoil Volume Estimates on page V -26, topsoil estimates do not <br />include topsoil piles related to B -Vent Shaft #2, SH -1, SH -2, B -Seam Dewatering <br />System/SH -3 and B -Vent Shaft #3. Please update Table V -4: Topsoil Volume Estimates <br />to include these facilities and related topsoil estimates. <br />7. Per Rules 2.04.11(4) and 2.05.6(2), please update T &E species and discuss potential <br />impacts to current State and Federal Threatened and Endangered plant and animal <br />species lists as needed. <br />8. As noted in BME's application for renewal, some minor discrepancies exist between the <br />acreages specified in the Division's last revision approval and the acreages provided by <br />BME. The Division currently has approved the amount of 464.86 disturbed acreage and <br />8,095.46 affected acreage. Please provide an explanation to the discrepancies between <br />acreages specified by the Division and what BME has provided. <br />9. Once the Division receives the response from BME regarding adequacy question #8, an <br />accurate updated reclamation cost estimate will be provided. As discussed with MR -157, <br />the removal of structures related to the B -Vent Shaft #2 will be removed from the <br />Division's reclamation cost estimate. <br />If you have any questions, please contact me. <br />Sincerely, <br />Zach T. Trujillo <br />Environmental Protection Specialist <br />Zach.Trujillo@state.co.us <br />(303) 866 -3567 x.8164 <br />C -MR -06 <br />