My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-03-25_REVISION - M1985112
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1985112
>
2014-03-25_REVISION - M1985112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:51:48 PM
Creation date
3/27/2014 1:16:38 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1985112
IBM Index Class Name
REVISION
Doc Date
3/25/2014
Doc Name
Response to adequacy review TR01
From
J&T Consulting, Inc.
To
DRMS
Type & Sequence
TR1
Email Name
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J &T Consulting, Inc. Loloff Construction <br />Ldd1 We <br />3/192014 <br />FRe.1amation Bond Qua ntities and Costs Bond Calc with 1 GIC Share and 1 New Cache Share <br />Ganithm L& <br />Summary of Unit Coat <br />ac $ <br />200 <br />$ <br />Direct costs <br />ac $ <br />2,000 <br />$ <br />Scarifying Ground <br />$ <br />200 <br />/ acre <br />Re- applying topsoil 12' thick <br />$ <br />2,000 <br />/ acre <br />Revegetating /Seeding disturbed area <br />$ <br />1,000 <br />/ acre <br />Mobilization <br />$ <br />2,500 <br />lump sum <br />Slurry Wall Cost Breakdown (0 -50 ft 0 $3 /ft - 51 -70 ft (a) $4/ft ) <br />Slurry Wall Cost (45 to 50 foot average depth) $ 135 /linear foot <br />Overhead and Profit Costs <br />Liability insurance 155% of direct cost <br />Performance bond 1.05% of direct cost <br />Profit 10.00% of direct cost <br />Total Overhead Cost 12.60% of direct cost <br />Project Management <br />Engineering and bidding 4 25% of direct cost <br />Management and administration 5 00% of direct cost <br />Total Additional Cost 9.25% of direct cost <br />Phaao 1 (5.8 acres) (Area that has 1 GIC share and 1 New Cache share to cover permanent augmentation) <br />Scarfying Ground in Disturbed Area <br />ac $ <br />200 <br />$ <br />Topsoil Placement in Disturbed Area <br />ac $ <br />2,000 <br />$ <br />Revegetate Disturbed Area <br />ac $ <br />1,000 <br />$ <br />Mobilization <br />Is $ <br />2,500 <br />$ <br />Total Direct Cost <br />$ <br />Overhead and Profit Cost (12.60 %) $ <br />contract Cost - <br />Project Management (9.25 %) $ <br />Total Required Financial Warranty For Phase 1 $ <br />1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.