Laserfiche WebLink
6.3 Recommendations for Additional Studies to upgrade facility performance <br />forextreme flood events ........................................................... .............................58 <br />6.3.1 Design of an Auxiliary Overflow Structure at the Drop Structure ............58 <br />6.3.2 Design of a Controlled Overflow from Ditch to Impoundment ................59 <br />6.4 Recommendations for additional inspections and monitoring .. .............................59 <br />7.0 REFERENCES ..................................................................................... .............................60 <br />LIST OF TABLES <br />Table 1 <br />Elevation- Area - Volume Relationships for San Luis Facility ... .............................23 <br />Table 2 <br />PMF Peak Flow Comparisons: Original Design and Current Analysis .................28 <br />Table 3 <br />PFMA Screening Categories ..................................................... .............................37 <br />Table 4 <br />Descriptive Probabilities ........................................................... .............................38 <br />Table 5 <br />Consequences Categories .......................................................... .............................39 <br />Table 6 <br />PFM -1: Overtopping of Drop Structure during Flood Event ... .............................44 <br />Table 7 <br />PFM -2: Internal Erosion or Piping of Embankment Materials .............................48 <br />Table 8 <br />Summary of Risk Estimates and Justification for Action ......... .............................51 <br />LIST OF FIGURES <br />Figure1 General Site Map ................................................................................ ..............................1 <br />Figure2 Tailing Impoundment ......................................................................... ..............................5 <br />Figure 3 San Luis Tailing Dam Typical Cross Section .................................... ..............................7 <br />Figure 4 Results of Upstream Stability Analyses ............................................. ..............................9 <br />Figure 5 Results of Downstream Stability Analyses ....................................... .............................10 <br />Figure 6 Site Visit 2, Right Abutment Groin Erosion Gulley before Repairs, Looking <br />Upstreamfrom Near Toe ...................................................................... .............................12 <br />Figure 7 Initial Site Inspection, Right Abutment Groin Erosion Gulley After Repairs, <br />Looking Downstream from Near Crest ................................................. .............................13 <br />San Luis Project Miller Geotechnical Consultants <br />Tailing Dam Data Report iv February 2014 <br />