Laserfiche WebLink
Mobilization Worksheet Cont'd Task # 005 <br />EQUIPMENT HAUL DISTANCE and Time <br />Nearest Major City or Town within project area region: <br />Total one -way travel distance: <br />Average Travel Speed: <br />Total Non - Roadable Mob/Demob Cost * <br />' * two round trips with haul rig: <br />Total Roadable Mob/Demob Cost ** <br />** one round trip, no haul rig: <br />Transportation Cycle Time: <br />Haul Time (Hours): <br />Return Time (Hours): <br />Loading Time (Hours): <br />Unloading Time (Hours): <br />Subtotals: <br />JOB TIME AND COST <br />Non - Roadable <br />Equipment <br />Roadable <br />Equipment <br />0.10 <br />0.10 <br />0.10 <br />0.10 <br />0.50 <br />NA <br />0.50 <br />NA <br />1.20 <br />0.20 <br />Total job time <br />Page 2 of 2 <br />ANTONITO <br />3.00 miles <br />30.00 mph <br />$2,539.47 <br />$11.16 <br />2.40 Hours <br />Total job cost: $2,550.63 <br />CIRCES Cost Estimating Software <br />