My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-03-21_REVISION - M1991133
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1991133
>
2014-03-21_REVISION - M1991133
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 2:12:33 PM
Creation date
3/21/2014 2:46:27 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1991133
IBM Index Class Name
REVISION
Doc Date
3/21/2014
Doc Name
Transfer of Permit SO01
From
Operator
To
DRMS
Type & Sequence
SO1
Inspection Date
11/19/2013
Email Name
WHE
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Site: <br />Page 1 of 2 <br />EQUIPMENT MOBILIZATION/DEMOBILIZATION <br />Task description: Haul reclamation equipment to and from job site. <br />Valdez Gravel Mine Permit Action: SO -01 bond update Pen it/Job #; _M1991133 <br />PROJECT IDENTIFICATION <br />Task #: 005 State: Colorado <br />Date: 3/19/2014 County: Cone'os <br />User: WHE <br />Agency or organization name: DBMS <br />EQUIPMENT TRANSPORT RIG COST <br />Abbreviation: None <br />Filename: M133 -005 <br />Shift basis: 1 per day <br />Cost Data Source: CRG Data <br />Truck Tractor Description: GENERIC ON- HIGHWAY TRUCK TRACTOR, 6X4, DIESEL POWERED, <br />400 HP (2ND HALF, 2006) <br />Truck Trailer Description: GENERIC FOLDING GOOSENECK, DROP DECK EQUIPMENT TRAILER <br />(25T, 50T, AND 100T) <br />Cost Breakdown: <br />Available Rig Capacities <br />0 -25 Tons <br />26-50 Tons <br />51+ Tons <br />Ownership Cost/Hour: <br />$16.63 <br />$18.37 <br />$22.33 <br />Operating Cost/Hour: <br />$44.38 <br />$46.13 <br />$50.07 <br />Operator Cost/Hour: <br />$27.66 <br />$27.66 <br />$27.66 <br />Helper Cost/Hour: <br />$0.00 <br />$25.39 <br />$25.39 <br />Total Unit Cost/Hour: <br />$88.67 <br />$117.55 <br />1 $125.45 <br />NON ROADABLE EQUIPMENT: <br />Machine <br />Weight/ <br />Owner ship <br />Haul Rig <br />Fleet <br />Haul Trip <br />Return Trip <br />DOT Permit <br />Description <br />Unit <br />Cost/hr/ unit <br />Cosvlrr /unit <br />Size <br />Cost/hr/ <br />Costihr/ fleet <br />Cost/ fleet <br />TONS <br />fleet <br />Cat D8T -8U <br />53.70 <br />$63.00 <br />$125.45 <br />1 <br />$188.45 <br />$125.45 <br />$250.00 <br />Drill/Broadcast <br />25.00 <br />$39.59 <br />$88.67 <br />2 <br />$256.51 <br />$177.34 <br />$500.00 <br />Seeder with Tractor <br />Subtotals: I $444.96 1 $302.79 1 $750.00 <br />ROADABLE EOUIPMEENT: <br />Machine Description <br />Total Cost/hr/ unit <br />Fleet Size <br />Haul Trip <br />Cost/hr/ fleet <br />Return Trip <br />Cost/hr/ fleet <br />Flatbed Truck 4x2 30K GV W <br />$55.81 <br />1 <br />$55.81 <br />$55.81 <br />Subtotals: $55.81 $55.81 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.