Laserfiche WebLink
will be dependent on the rate of mining. The maximum anticipated unreclaimed and disturbed <br />slope will be 1200 feet long. <br />2. Mininjj Timetable <br />The following table (Table D -2) is a best estimate of the sequence of operations for the life of the <br />mine and is based on the maximum production of 200,000 tons per year. <br />Tomichi Pit, December 2013 D -3 <br />