MINING PLAN <br />1. General Minim Plan <br />EXHIBIT D <br />The access to the site will be via US Highway 50. See Map C -2 for the extents of mining. As <br />shown on this map, mining will occur in two stages, where the first stage take place in the main <br />eastern excavation area, and the second stage in the smaller, west excavation area. Table D -1 <br />shows the quantities for each stage. <br />Table D -1 Mining Area Material Table <br />Mining <br />Phase <br />Acreage <br />Total Excavation <br />(CY) <br />Topsoil <br />(CY) <br />Overburden <br />(CY) <br />Gravel (CY) <br />Gravel <br />(tons) <br />Time to Mine <br />(Yrs) <br />1 <br />53.70 <br />3,665,949 <br />86,636 <br />346,544 <br />3,232,769 <br />4,849,153 <br />24.2 <br />2 <br />6.86 <br />328,433 <br />11,067 <br />44,270 <br />273,096 <br />409,644 <br />2.0 <br />Total <br />60.56 <br />3,994,382 <br />1 97,703 <br />390,814 <br />3,505,865 <br />5,258,797 <br />26.3 <br />The material volumes described in Table D -1 are based on 12 inches of topsoil, an average of <br />four feet of overburden, and the remaining depth being sand and gravel. This was determined <br />during exploration drilling. Note that the areas above only include mining areas. The anticipated <br />total disturbed area for the operation consists of 72.70 acres. Only 60.56 acres of this is mining, <br />the rest is the sediment pond, berms, roads, and the office /scale area. <br />Topsoil and overburden will be stripped in advance of mining. Topsoil and overburden in the <br />early period of the operation will be used to build the berms. The Processing Berm will comprise <br />mostly of overburden, with topsoil on the outside to facilitate vegetation. This berm will be <br />removed during the mine life. The Highway and Signal Peak berms will be built with only <br />topsoil. These berms are permanent, and therefore will be seeded upon completion with the <br />permanent rangeland seed mix. <br />Berm volume requirements can be seen in Table D -3. Topsoil from initial mining will be used on <br />the processing area berms to improve vegetation on said berms. <br />Sand and gravel will be directly loaded into the crusher and screener. It will be excavated from <br />the pit highwall with a front -end loader. Once crushed and screened the sand and gravel will <br />Tomichi Pit, December 2013 D -1 <br />