My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-03-18_INSPECTION - P2010005
DRMS
>
Day Forward
>
Inspection
>
Prospect
>
P2010005
>
2014-03-18_INSPECTION - P2010005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:41:07 PM
Creation date
3/20/2014 8:48:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2010005
IBM Index Class Name
INSPECTION
Doc Date
3/18/2014
Doc Name
Inspection report
From
DRMS
To
Greg Cardova and Charles Valdez
Inspection Date
11/15/2013
Email Name
WHE
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task description: <br />Site: Lickskillet Claims <br />Page 1 of 2 <br />BULLDOZER WORK <br />General grading, ensure 311: IV final slopes <br />Permit Action: Routine bond update Permit/Job #: P2010005 <br />PROJECT IDENTIFICATION <br />Task #: 001 State: Colorado <br />Date: 3/17/2014 County: Conejos <br />User: WHE <br />Agency or organization name: DBMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Cat D6T <br />Horsepower: <br />185 <br />Blade Type: <br />Semi- Universal <br />Attachment: <br />3 -shank ripper <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />Abbreviation: None <br />Filename: P005 -001 <br />Total unit Cost/Hour: $131.40 <br />Total Fleet Cost/hour: <br />$131.40 <br />MATERIAL QUANTITIES <br />Source <br />Initial Volume: <br />Utilization % <br />Ownership Cost/Hour: <br />$33.12 <br />Loose volume: <br />NA <br />Operating Cost/Hour: <br />$57.97 <br />100 <br />Ripper op. Cost/Hour: <br />$2.89 <br />100 <br />Operator Cost/Hour: <br />$37.41 <br />i NA <br />Total unit Cost/Hour: $131.40 <br />Total Fleet Cost/hour: <br />$131.40 <br />MATERIAL QUANTITIES <br />Source <br />Initial Volume: <br />807 <br />Swell factor: <br />1.000 <br />Loose volume: <br />807 LCY <br />Source of estimated volume: (1.0ac)(43560sFac)(0.5'13) / 27 = 806.667 cy <br />Source of estimated swell factor: NA <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />50 feet <br />444.6 LCY /hr <br />Materials consistency description: Consolidated stockpile 1.0 <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />0% <br />7,700 feet <br />650 lbs/LCY <br />Weight description: Decomposed rock - 25% Rock, 75% Earth <br />Job Condition Correction Factor <br />Source <br />Operator Skill: 0.750 <br />AVG.) <br />Material consistency: 1.000 <br />CAT HB <br />Dozing method: 1.000 <br />GEN. <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.