My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-03-18_INSPECTION - P2010005
DRMS
>
Day Forward
>
Inspection
>
Prospect
>
P2010005
>
2014-03-18_INSPECTION - P2010005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:41:07 PM
Creation date
3/20/2014 8:48:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2010005
IBM Index Class Name
INSPECTION
Doc Date
3/18/2014
Doc Name
Inspection report
From
DRMS
To
Greg Cardova and Charles Valdez
Inspection Date
11/15/2013
Email Name
WHE
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br />Task description: Summary of reclamation tasks and costs <br />Permit Action: Routine bond <br />Site: Lickskillet Claims update Permit/Job #: P2010005 <br />PROJECT IDENTIFICATION <br />Task #: 000 State: Colorado <br />Date: 3/17/2014 County: Conejos <br />User: WHE <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Abbreviation: None <br />Filename: P005 -000 <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />001 <br />002 <br />003 <br />004 <br />General grading, ensure 3H: IV final slopes <br />DOZER <br />1 <br />1 <br />1 <br />1 <br />4.20 <br />$551.50 <br />$32.17 <br />$791.21 <br />$1,173.82 <br />Distribute growth medium <br />DOZER <br />0.25 <br />Revegetate 1.0 acres affected lands <br />REVEGE <br />0.00 <br />Haul reclamation equipment to and from job site <br />MOBILIZE <br />4.80 <br />SUBTOTALS: <br />9.25 1 <br />$2,548.70 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: <br />2.02% <br />Performance bond: <br />1.05% <br />Job superintendent: <br />0.00 hrs <br />Profit: <br />10.00% <br />Total <br />Total = <br />Total = <br />Total = <br />TOTAL O &P= <br />CONTRACT AMOUNT (direct + O & P) = <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): 500.00 <br />Engineering work and/or contract/bid preparation: 0.00% <br />Reclamation management and/or administration: 5.00% <br />CONTINGENCY: 0.00 <br />$51.48 <br />$26.76 <br />50.00 <br />$254.87 <br />$333.11 <br />$2,881.81 <br />Total = 500.00 <br />Total = $0.00 <br />$144.09 <br />Total = $0.00 <br />TOTAL INDIRECT COST = $977.20 <br />TOTAL BOND AMOUNT (direct + indirect) = $3,525.90 <br />
The URL can be used to link to this page
Your browser does not support the video tag.