C. Project Description. Describe all aspects of the operation including mining, milling, and <br />exploration methods, materials, equipment, workforce, construction and operation schedule, power <br />requirements, how clearing will be accomplished, topsoil stockpile, waste rock placement, tailings <br />disposal, proposed number of drillholes and depth, depth of proposed suction dredging, and how <br />gravels will be replaced, etc. Calculate production rates of ore. Include justification and <br />calculations for settling pond capacities, and the size of runoff diversion channels. <br />Rotary drilling. 10,000 feet Road maintenance and construction will be initiated about June 15, <br />2013, weather and road condition permitting. The roads to the drill pads and the locations of the drill pads <br />will be surveyed by a Registered Land Surveyor. <br />Grading will be done with a small bulldozer or backhoe. Attachment 3 is a photograph of Drill Hole No. 3, <br />completed in 2002. Drill cuttings will be bagged at the drill sites and transported each shift to logging sheds at <br />the Mill Site. After logging, splits will be shipped for analysis. <br />The drill and supporting equipment will be mobilized as soon as the drill pads have been prepared. The <br />two 12 -hour shift, seven <br />(lf more space is needed to fill out a block of information, use additional sheets and attach form) <br />-3- <br />