My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-02-28_PERMIT FILE - P2014003 (2)
DRMS
>
Day Forward
>
Permit File
>
Prospect
>
P2014003
>
2014-02-28_PERMIT FILE - P2014003 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:40:25 PM
Creation date
3/18/2014 9:17:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2014003
IBM Index Class Name
PERMIT FILE
Doc Date
2/28/2014
Doc Name
NOI Application
From
Sierta LLC
To
DRMS
Email Name
TAK
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C. Project Description. Describe all aspects of the operation including mining, milling, and <br />exploration methods, materials, equipment, workforce, construction and operation schedule, power <br />requirements, how clearing will be accomplished, topsoil stockpile, waste rock placement, tailings <br />disposal, proposed number of drillholes and depth, depth of proposed suction dredging, and how <br />gravels will be replaced, etc. Calculate production rates of ore. Include justification and <br />calculations for settling pond capacities, and the size of runoff diversion channels. <br />Rotary drilling. 10,000 feet Road maintenance and construction will be initiated about June 15, <br />2013, weather and road condition permitting. The roads to the drill pads and the locations of the drill pads <br />will be surveyed by a Registered Land Surveyor. <br />Grading will be done with a small bulldozer or backhoe. Attachment 3 is a photograph of Drill Hole No. 3, <br />completed in 2002. Drill cuttings will be bagged at the drill sites and transported each shift to logging sheds at <br />the Mill Site. After logging, splits will be shipped for analysis. <br />The drill and supporting equipment will be mobilized as soon as the drill pads have been prepared. The <br />two 12 -hour shift, seven <br />(lf more space is needed to fill out a block of information, use additional sheets and attach form) <br />-3- <br />