March 12, 2014 C- 1982 - 056 /Foidel Creek Mine JDM <br />Development Drillhole 48 Mudpit Development Drillhole 49 on reclaimed 18RT pad <br />PROCESSING WASTE /COAL MINE WASTE PILES — Rule 4.10 and 4.11 <br />Drainage Control; Surface Stabilization; Placement: <br />Refuse material continues to be placed in the RDA expansion area. Material was in the process of stockpiling at <br />the time of the inspection. The RDA was dry, well compacted and stable at the time of the inspection. The RDA <br />was snow covered with the exception of the active refuse stockpiling. The first lift of the RDA Expansion has been <br />completed. Phase 1 of the RDA expansion is nearing completion. The eastern temporary diversion ditch was in <br />the process of construction at the time of the inspection. No problems were noted at the RDA. <br />RDA Compacted Material <br />Number of Partial Inspection this Fiscal Year: 7 <br />Number of Complete Inspections this Fiscal Year: 3 <br />Page 4 of 7 <br />