Susan Burgmaier -2- March 10, 2014
<br />Reclamation Estimate
<br />The reclamation estimate will not increase as a result of this permit revision.
<br />Baseline Water Monitoring
<br />There are three springs, four springs with ponds or tanks, six ponds and one drainage
<br />for which BRL will be accumulating additional baseline data during the review period.
<br />One paper and one electronic copy of the following data are enclosed.
<br />Volume I Table of Contents, Pages i, ii, x
<br />Section 2.03, Pages 2.03 -4, 5, 6, 7, 15, 16, 17, 24, 25
<br />Section 2.04, Pages 2.04 -11, 12, 13, 27 -125
<br />Section 2.05, Pages 2.05 -2, 3, 8, 84, 85, 86, 98 -179
<br />Section 2.06, Pages 1 - 4
<br />Section 2.10, Pages 1 - 6
<br />Volume II Maps 1, 2, 3, 4A, 5, 6, 7, 8, 8A, 9, 10A, 10B, 12, 13, 14 -13, 23, 23A, 25,
<br />27, 27 -B
<br />Volume III Tab 1 Overland Ditch and Reservoir Company Lease
<br />Tab 3, Baseline Water Monitoring
<br />Tab 9 BLM /USFWS Memorandum
<br />Tab 15 Subsidence Prediction, Handbook & New Figures 15 -6 through
<br />15 -16
<br />Volume VI Class III Cultural Resources Inventory and Paleontological Assessment of
<br />the Spruce Stomp Lease
<br />Sincerely,
<br />J. E. Stover, P.E.
<br />Consulting Engineer
<br />Cc: Bureau of Land Management - Electronic
<br />USDA -FS - Electronic
<br />Paonia Library
<br />Bill Bear
<br />
|