Laserfiche WebLink
Figure 3 - Revised <br />Exhibit C -8 - Technical Revision 2014 <br />Transit Mix - Pueblo East Pit Phases 1 & 2 <br />Depth to Ground Water <br />0 <br />5 <br />w <br />a <br />L 10 <br />0 <br />0 <br />C <br />0 <br />0 <br />15 <br />6 <br />0 <br />w <br />L <br />20 <br />3 <br />0 <br />a 25 <br />A <br />30 <br />35 <br />40 <br />— «—MW -1 <br />-t -MW -101 <br />MW -2 <br />BMW -102 <br />t MW -3 <br />-&--MW-103 <br />-�- MW -4 <br />-f- MW -4R <br />-r- MW -5 <br />-a-- MW -105 <br />t MW -6 <br />-�- MW -7 <br />-- MW -70bs <br />--o-MW-8 <br />-*.- MW -299 <br />--+- MW -199 <br />-� MW -9 <br />- -MW -10 <br />-+- MW -11 <br />O'b OAR OS DK ooh Ooh ooh Orb Orb orb O0� Off^ O�1 O�� o�� O�4> ooq ooq o�q <br />Notes: <br />Several wells, including MW -1, 199, 2, 3, 4, 5, 6, 7, 70bs, 9, and 10, were mined through at various mining stages and are no longer used. <br />Wells MW -1, MW -2, MW -3, MW -5, and MW -199 were located within the slurry wall, and are not representative of local ground water conditions after November 2008. <br />MW-4R is located at higher elevation than MW -4, resulting in a greater depth to water than in MW-4. Offset between MW -4 data in May 2010 and MW-4R data from July 2011 to present <br />are the result of differing ground surface elevations. <br />BBA <br />water cunsulrancs BIStfOP-BROGDEN ASSOCIATES. INC. Printed On: 2/12 /2014 PJB <br />