Laserfiche WebLink
Pagel of 2 <br />SCRAPER TEAM WORK <br />Task description: Spread 6 inches of Topsoil <br />Site: Caldwell- Nesselhuf Pit No. 1 Permit Action: 2013 Inspection Permit/Job #: M1997071 <br />PROJECT IDENTIFICATION <br />Task #: 002 State: Colorado <br />Date: 12/2/2013 County: Crowley <br />User: TOD <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />- Scraper: <br />Cat 627G <br />- Dozer: I NA <br />Support Equipment -Load Area: NA <br />-Dump Area: NA <br />Road Maintenance —Motor Grader: NA <br />-Water Truck: NA <br />Abbreviation: None <br />Filename: M071 -002 <br />COSTShift basis: 1 per day <br />ipti <br />Cnst Rreakdawn- Scraner Work Team Sunnort F.auinment Maintenance Eauinment <br />Total work team cost/hour: $509.86 <br />MATERIAL OUANTITIES <br />Initial volume: 6,776 CCY Swell factor: 1.429 <br />Loose volume: 9,680 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Material weight: 1,600 lbs/LCY <br />Material description: Top Soil <br />Rated Payload: 52,800 pounds <br />Payload Capacity: 33.00 LCY <br />Scraner Bowl (volume) Basis: <br />Struck Volume: <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />90 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ownership cost/hour: <br />$63.31 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operating cost/hour: <br />$161.60 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operator cost/hour: <br />$30.02 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />$254.93 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Number of Units: <br />2 <br />0 <br />0 <br />0 <br />0 <br />0 <br />Group Subtotals: <br />Work: <br />$509.86 <br />Support: <br />$0.00 <br />Maint: <br />$0.00 <br />Total work team cost/hour: $509.86 <br />MATERIAL OUANTITIES <br />Initial volume: 6,776 CCY Swell factor: 1.429 <br />Loose volume: 9,680 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Material weight: 1,600 lbs/LCY <br />Material description: Top Soil <br />Rated Payload: 52,800 pounds <br />Payload Capacity: 33.00 LCY <br />Scraner Bowl (volume) Basis: <br />Struck Volume: <br />15.70 <br />LCY <br />Heaped Volume: <br />22.00 <br />LCY <br />Average Volume: <br />18.85 <br />LCY <br />Adjusted Capacity: <br />18.85 <br />LCY <br />CIRCES Cost Estimating Software <br />