Laserfiche WebLink
Bulldozer Worksheet Cont'd Task # 001 Page 2 of 2 <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />1.000 <br />AVG. <br />0.830 <br />(1 SHIFT/DAY) <br />0.900 <br />(SSD -FC) <br />1.115 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.793 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.5944 <br />Adjusted unit production: <br />Adjusted fleet production: <br />742.94 LCY/hr <br />742.94 LCY/hr <br />JOB TIME AND COST <br />Fleet size: 1 Dozer(s) <br />Unit cost: $0.284/LCY <br />Total job time: 4.21 Hours <br />Total job cost: $887.53 <br />CIRCES Cost Estimating Software <br />