Laserfiche WebLink
EXISTING FREE -WATER POOL <br />PROVIDE EROSION <br />PROTECTION IN DAM GROIN <br />AREA TO PREVENT GULLYING <br />\ / RAISE BERM CREST <br />CLEAN OUT AND PERFORM TO EL 8826 <br />CAMERA INSPECTION OF /; <br />DRAIN PIPES UNDER DAM <br />EMBANKMENT—""", / <br />/ <br />SOUTH DIVERSION DITCH �/ SOUTH DIVERSION DITCH <br />DROP STRUCTURE <br />REMOVE CHANNEL <br />CO <br />PROVIDE EROSION PROTECTION ON OVERFLOW <br />CONSTRICTION <br />AREA ADJACENT TO SOUTH SIDE DROP STRUCTURE <br />m:x A <br />Miller Geotechnical Consultants <br />NORT <br />SCALE IN FEET <br />0 40 <br />February 2014 <br />Figure 20 <br />Recommendations <br />