Laserfiche WebLink
CERTIFICATION TO DISCHARGE UNDER <br />°p c °to CDPS GENERAL PERMIT COR340000 <br />o STORMWATER ASSOCIATED WITH SAND & GRAVEL MINING & PROCESSING <br />u <br />.r rh <br />187* * Certification Number: COR341720 <br />Colorado D ent This Certification to Discharge specifically authorizes: <br />of Public <br />andEnvironment Cowman lean <br />to discharge stormwater from the facility identified as <br />Agnus Dei lode claim <br />to: <br />Ruxton Creek - Fountain Creek <br />Facility Located at: Del Mtn Rd and Aspen Ridge Rd - North by trail uninc El Paso County, CO <br />Center Point Latitude 38.842877 Longitude - 104.948956 <br />All discharges must comply with the lawful requirements of federal agencies municipalities, counties, drainage districts and other <br />local agencies regarding any discharges to storm drain systems, conveyances, or other water courses under their jurisdiction. <br />Monitorine Requirements <br />Parameter <br />Units <br />Benchmark Values <br />Rationale <br />Monitoring <br />Sample <br />Type <br />Total Suspended Solids (TSS) <br />mg /L <br />100 <br />Ben hmarks <br />Quarterly <br />Grab <br />Additional Monitoring Requirements <br />On the effective date of this certification, the Angus Dei lode claim facility is subject to the monitoring requirements discussed <br />below at each discharge point of stormwater from the facility. <br />Monitoring frequency: The permittee must collect samples of stormwater discharge from the facility once per quarter unless <br />otherwise directed by the Division. <br />Measurable Storm Event: For this certification, monitoring is only required once per quarter, regardless of the number of <br />measureable storm events. However, if additional samples are collected during the quarter, these additional samples must also <br />be included in the DMR summary as described below. <br />Rain event. Permittees must conduct monitoring, as specified in the Monitoring Requirements table above, on a storm event <br />that results in an actual discharge from the facility (measurable storm event), and that follows the preceding measurable <br />storm event by at least 72 hours (3 days). <br />• Snowmelt event. The permittee must conduct snowmelt monitoring at a time when a measurable discharge occurs from the <br />facility. <br />Storm Event Information <br />• Rain event. The permittee must document the information below for each monitored event. <br />i. The date, time of the start of the discharge, time of sampling, duration (in hours) of the rainfall event, and magnitude (in <br />inches) of the storm event sampled; <br />ii. The duration between the storm event sampled and the end of the most recent storm event that produced a discharge. <br />• Snowmelt monitoring. The permittee must document the date of the sampling event for each monitored snowmelt event. <br />