My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-03-10_INSPECTION - M2006013
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M2006013
>
2014-03-10_INSPECTION - M2006013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:40:51 PM
Creation date
3/10/2014 4:47:27 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2006013
IBM Index Class Name
INSPECTION
Doc Date
3/10/2014
Doc Name
Inspection report
From
DRMS
To
Eastern Colorado Aggregates, LLLP
Inspection Date
1/27/2014
Email Name
TOD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pagel of 2 <br />SCRAPER TEAM WORK <br />Task description: Spread overburden/process waste rock <br />Site: Potts Pit #2 Permit Action: 2014 Inspection Permit/Job #: M2006013 <br />PROJECT IDENTIFICATION <br />Task #: 001 State: Colorado <br />Date: 2/21/2014 County: Huerfano <br />User: TOD <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />- Scraper: I Cat 627G <br />- Dozer: I Cat D8T - 8U <br />Support Equipment -Load Area: NA <br />-Dump Area: NA <br />Road Maintenance —Motor Grader: NA <br />-Water Truck: NA <br />Abbreviation: None <br />Filename: M013 -001 <br />COSTShift basis: 1 per day <br />Cost Breakdown: Scraner Work Team Sunnort Eauipment Maintenance Eauipment <br />Total work team cost/hour: $750.26 <br />MATERIAL OUANTITIES <br />Initial volume: 40,100 CCY <br />Loose volume: 45,056 LCY <br />Source of estimated volume: DRMS Inspecl <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Material weight: <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />100 <br />NA <br />NA <br />NA <br />NA <br />Ownership cost/hour: <br />$63.31 <br />$63.00 <br />NA <br />NA <br />NA <br />NA <br />Operating cost/hour: <br />$179.56 <br />$104.06 <br />NA <br />NA <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />$0.00 <br />NA <br />NA <br />NA <br />NA <br />Operator cost/hour: <br />$30.02 <br />$37.41 <br />NA <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />$272.89 <br />$204.48 <br />NA <br />NA <br />NA <br />NA <br />Number of Units: <br />2 <br />1 <br />0 <br />0 <br />0 <br />0 <br />Group Subtotals: <br />Work: <br />$750.26 <br />Support: <br />$0.00 <br />Maint: <br />$0.00 <br />Total work team cost/hour: $750.26 <br />MATERIAL OUANTITIES <br />Initial volume: 40,100 CCY <br />Loose volume: 45,056 LCY <br />Source of estimated volume: DRMS Inspecl <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Material weight: <br />2,9001bs/LCY <br />Material description: <br />Sand and gravel - Dry <br />Rated Payload: <br />52,800 pounds <br />Payload Capacity: <br />18.21 LCY <br />Swell factor: 1.124 <br />L:320ft W:225ftH:20ft <br />Scraper Bowl (volume) Basis: <br />Struck Volume: <br />15.70 <br />LCY <br />Heaped Volume: <br />22.00 <br />LCY <br />Average Volume: <br />18.85 <br />LCY <br />Adjusted Capacity: <br />18.21 <br />LCY <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.