My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-03-10_INSPECTION - M2006013
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M2006013
>
2014-03-10_INSPECTION - M2006013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:40:51 PM
Creation date
3/10/2014 4:47:27 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2006013
IBM Index Class Name
INSPECTION
Doc Date
3/10/2014
Doc Name
Inspection report
From
DRMS
To
Eastern Colorado Aggregates, LLLP
Inspection Date
1/27/2014
Email Name
TOD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task description: Reclaim Potts Pit #2 <br />Site: Potts Pit #2 <br />PROJECT IDENTIFICATION <br />COST SUMMARY WORK <br />Permit Action: 2014 Inspection Permit/Job #: M2006013 <br />Task #: 999 State: Colorado <br />Date: 2/21/2014 County: Huerfano <br />User: TOD <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Abbreviation: None <br />Filename: M013 -999 <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />001 <br />002 <br />003 <br />004 <br />Spread overburden/ process waste rock <br />SCRAPERI <br />1 <br />1 <br />1 <br />1 <br />44.97 <br />$33,740.48 <br />$10,412.37 <br />$15,272.72 <br />$3,667.88 <br />Spread 6 inches of topsoil <br />SCRAPERI <br />13.88 <br />Re-Vegetation <br />REVEGE <br />45.00 <br />Mobilization/ De- Mobilization <br />MOBILIZE <br />3.77 <br />SUBTOTALS: <br />107.62 <br />$63,093.45 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: <br />2.02% <br />Total = <br />$1,274.49 <br />Performance bond: <br />1.05% <br />Total = <br />$662.48 <br />Job superintendent: <br />40.00 hrs <br />Total = <br />$2,616.40 <br />Profit: <br />10.00% <br />Total = <br />$6,309.35 <br />TOTAL O & P = <br />$10,862.72 <br />TOTAL BOND AMOUNT (direct + indirect) = <br />$77,653.98 <br />CONTRACT AMOUNT (direct + O & P) = <br />$73,956.17 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal /related costs): <br />0.00 <br />Total = <br />0.00 <br />Engineering work and/or contract/bid preparation: <br />0.00% <br />Total = <br />$0.00 <br />Reclamation management and /or administration: <br />5.00% <br />$3,697.81 <br />CONTINGENCY: <br />0.00 <br />Total = <br />$0.00 <br />TOTAL INDIRECT COST = <br />$14,560.53 <br />TOTAL BOND AMOUNT (direct + indirect) = <br />$77,653.98 <br />
The URL can be used to link to this page
Your browser does not support the video tag.