Laserfiche WebLink
Scraper Worksheet Cont'd Task # 002 Page 2 of 2 <br />Cycle Time: <br />Scraper Loading Time: <br />Maneuver and Spread Time: <br />Job Condition Correction: <br />0.50 Minutes <br />0.60 Minutes <br />Site Altitude: 6250 feet <br />Net Correction: 0.830 0.830 <br />Travel Time: <br />Road Condition: Rutted dirt, little maintenance, no water, I" tire penetration 4.0 <br />Nan] Rnute- <br />Seg # <br />Scraper <br />Push Dozer <br />Source <br />Altitude Ad': <br />1.000 <br />1.000 <br />CAT HB <br />Job Efficiency: <br />0.830 <br />0.830 <br />CAT HB <br />Site Altitude: 6250 feet <br />Net Correction: 0.830 0.830 <br />Travel Time: <br />Road Condition: Rutted dirt, little maintenance, no water, I" tire penetration 4.0 <br />Nan] Rnute- <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />Roll. Res <br />Total Res <br />Velocity (fpm) <br />Travel Time <br />(min) <br />1 <br />700.00 <br />0.00 <br />4.00 <br />4.00 <br />2665 <br />0.43 <br />Haul Time: 0.43 minutes <br />Return Rnute- <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />Roll. Res <br />Total Res <br />Velocity (fpm) <br />Travel Time <br />(min) <br />1 <br />700.00 <br />0.00 <br />4.00 <br />4.00 <br />2849 <br />0.37 <br />Return Time: <br />0.37 <br />minutes <br />Total Scraper team cycle time: <br />1.90 <br />minutes <br />Adjusted for job conditions: <br />494.07 <br />LCY/Hour <br />Selected Number of Scrapers: <br />2 <br />Scraper(s) <br />Adjusted single scraper team (unit) hourly production: <br />988.14 <br />LCY/Hour <br />Adjusted multiple scraper team (fleet) hourly production: <br />988.14 <br />LCY/Hour <br />Unadjusted unit production/hour: 595.26 LCY/Hour <br />Optimal Number of Scrapers per push dozer: <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) Total job time: <br />13.88 <br />Hours <br />Unit cost: $0.759 /LCY Total job cost: $10,412.37 <br />CIRCES Cost Estimating Software <br />