Laserfiche WebLink
Task description: <br />Site: Potts Pit #2 <br />Page 1 of 2 <br />SCRAPER TEAM WORK <br />Spread 6 inches of topsoil <br />Permit Action: 2014 Inspection Permit/Job #: M2006013 <br />PROJECT IDENTIFICATION <br />Task #: 002 State: Colorado <br />Date: 2/21/2014 County: Huerfano <br />User: TOD <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />Equipment De: <br />- Scraper: Cat 627G <br />- Dozer: Cat D8T - 8U <br />Support Equipment -Load Area: NA <br />-Dump Area: NA <br />Road Maintenance —Motor Grader: NA <br />-Water Truck: NA <br />Abbreviation: None <br />Filename: M013 -002 <br />COSTShift basis: 1 per day <br />f nct RrPakdnwn- Rcraner Work Team Sunnnrt Equinment Maintenance Fauinment <br />Total work team cost/hour: $750.26 <br />MATERIAL OUANTITIES <br />Initial volume: 11,287 CCY Swell factor: 1.215 <br />Loose volume: 13,714 LCY <br />Source of estimated volume: Approved Reclimation plan <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />100 <br />NA <br />NA <br />NA <br />NA <br />Ownership cost/hour: <br />$63.31 <br />$63.00 <br />NA <br />NA <br />NA <br />NA <br />Operating cost/hour: <br />$179.56 <br />$104.06 <br />NA <br />NA <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />$0.00 <br />NA <br />NA <br />NA <br />NA <br />Operator cost/hour: <br />$30.02 <br />$37.41 <br />NA <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />$272.89 <br />$204.48 <br />NA <br />NA <br />NA <br />NA <br />Number of Units: <br />2 <br />1 <br />0 <br />0 <br />0 <br />0 <br />Group Subtotals: <br />Work: <br />$750.26 <br />Support: <br />$0.00 <br />Maint: <br />$0.00 <br />Total work team cost/hour: $750.26 <br />MATERIAL OUANTITIES <br />Initial volume: 11,287 CCY Swell factor: 1.215 <br />Loose volume: 13,714 LCY <br />Source of estimated volume: Approved Reclimation plan <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Scraper Bowl (volume) Basis: <br />Material weight: <br />1,600 lbs/LCY <br />Struck Volume: <br />15.70 <br />LCY <br />Material description: <br />Top Soil <br />Heaped Volume: <br />22.00 <br />LCY <br />Rated Payload: <br />52,800 pounds <br />Average Volume: <br />18.85 <br />LCY <br />Payload Capacity: <br />33.00 LCY <br />Adjusted Capacity: <br />18.85 <br />LCY <br />CIRCES Cost Estimating Software <br />