Laserfiche WebLink
3.3.2 Non - Structural Controls <br />Dust Control Operations <br />During and post - construction dust control BMP measure will include sprinkling the ground <br />surface with water and/or spray on chemical soil treatments during high wind events. <br />Ore Pond Stormwater <br />Collected stormwater from the Pond #2 will periodically be pumped directly into the <br />underground mine workings for use. An attendant is required to be consistently present during <br />this operation to monitor pumping activities and ensure leaks aren't present. <br />Good Housekeeping <br />Good onsite housekeeping will be performed including but not limited to routine cleanup of <br />construction debris and trash. A water proof and bear proof trash container will be located on the <br />site to temporarily store waste materials until they can be removed from the site. <br />Heavy Equipment/ Vehicles <br />Heavy equipment staged on -site, and other vehicles will be properly maintained and inspected <br />daily. Vehicular staging area will be located north of the ore pad, north of the mine portal. <br />7 <br />