Laserfiche WebLink
Bowie No. 2 Mine C1996083 Technical Revision No. 84- Second Adequacy Review <br />20. Response accepted. BRL revised paragraph 2 of page 9 of Volume XI as suggested. <br />21. This item will be addressed under Technical Revision No. 77. <br />Page 3 of 15 <br />22. Response accepted. BRL provided appropriate designs for alternate sediment control measures on the <br />topsoil stockpiles. <br />23. Response accepted. BRL revised page App. B -2, and the design information as requested. <br />24. BRL revised the table on page Volume XI, App. B -2 as requested, however we have identified a few minor <br />omissions in the table that should be corrected. Please revise the table as follows: <br />a. Please provide the bottom with for Ditch J9 (3.0'). <br />b. Please note the 9" rip rap on ditches J18 and J19. <br />There are a couple of inconsistencies between page Volume XI, App. B -2 and other pages or maps. Please <br />correct the following: <br />a. The table on App. B -2 indicates that the 6% section of the east clean water diversion is a V- Ditch. The <br />design information on page B -67 is for a trapezoidal ditch with a bottom width of 0.0'. Please provide a <br />revised design on page a -67 using the triangular ditch utility so that the ditch type in the heading is <br />consistent with the table. <br />b. For Culvert J2, the App. B -2 table and the design on page B -30 both indicate that the culvert will be a 24" <br />diameter pipe. Map 22J indicates that the minimum size will be 30 ". Please revise Map 22J to indicate <br />that the minimum size required is 24 ". BRL can retain the 30" proposed pipe by adding a note that a 30" <br />pipe will be installed. <br />25. Response accepted. BRL provided supporting calculations for the 24" double barrel configuration proposed <br />for Culvert J9 as requested. <br />26. Response accepted. BRL revised page App. B -7 as requested. <br />27. Response accepted. BRL revised the design information as requested. <br />28. Response accepted. BRL revised the design information as requested. <br />29. Response accepted. BRL revised the design information as requested. <br />30. BRL provided the design information as requested. The previously submitted East Clean Water Diversion <br />designs included an add -on table to indicate how the flow value was derived for each segment of the ditch. <br />The table identified the source and flow of all areas contributing to the ditch. Please revise pages 8 -67, 8 -72, <br />and a -73 to retain the previously proposed flow derivation information that explained the total flow value <br />used for each of the East Clean Water Diversion segment designs. <br />a. New Item — The flow value used for the 1% segment of the East Clean Water ditch appears to be in error. <br />The Sedcad run on page B -74 indicates that the flow for the watersheds draining directly to the ditch will <br />CIRCES Cost Estimating Soffi are <br />