My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-03-06_REVISION - C1996083 (3)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2014-03-06_REVISION - C1996083 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:40:47 PM
Creation date
3/7/2014 8:07:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Revision
Doc Date
3/6/2014
Doc Name
2nd Adequacy Review
From
DRMS
To
Bowie Resources, LLC
Type & Sequence
TR84
Email Name
SLB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866 -3567 <br />FAX: (303) 832 -8106 <br />March 6, 2014 <br />William A. Bear <br />Bowie Resources, LLC <br />P.O. Box 483 <br />Paonia, CO 81428 <br />Re: Bowie No. 2 Mine (Permit No. C- 1996 -083) <br />Technical Revision No. 84 (TR- 84) <br />Gob Pile #3 Reconfiguration and Pond 1 Expansion <br />Dear Mr. Bear: <br />COLORADO <br />ID I V I S I O N O F <br />RECLAMATION <br />MINING <br />SAFETY <br />John W. Hickenlooper <br />Governor <br />Mike King <br />Executive Director <br />Loretta E. Pineda <br />Director <br />The Division has reviewed the response provided by JE Stover & Associates, Inc. on behalf of Bowie Resources, <br />LLC (BRL) to our preliminary adequacy review of the technical revision application (TR -84) for the Bowie No. 2 <br />Mine. The revision proposes to reconfigure and expand Gob Pile #3, and enlarge Pond J. We have the <br />following comments and questions on the response. <br />General Comments <br />1. BRL has directed the Division to remove proposed Appendix A, to be reviewed instead under Technical <br />Revision No. 77, as we requested. Please restore the approved cover material and topsoil replacement <br />depths on pages 4 and 10 of Volume Xl, pending further review of the proposed replacement depth <br />changes under TR -77. <br />Revised Application Pages <br />2. Page 2.05 -12 has been revised, as requested. The paragraph detailing Gob Pile #3, however, refers to MR- <br />139 for permitting the gob drying area. The gob drying area was approved with MR -141. Please correct <br />the minor revision reference in the Gob Pile #3 summary on page 2.05 -12. <br />3. BRL provided additional certification pages as requested, however the certification page for all of Volume XI <br />(first page, currently dated October 2006) will also need to updated. <br />4. Response accepted. BRL revised page Exh 8 -26 as requested. <br />5. Response accepted. BRL included a revised page Exh 8 -30 as requested. <br />6. BRL made the requested edits. Additionally, BRL revised the Flow Depth and Velocity for Ditch E -1 on <br />page EXH -8 -12, but not the Flow (cfs) or Ditch Grade. The revised values are inconsistent with the <br />currently approved design information, and are not reflected on revised page 8 -29i. Please provide <br />Office of Office of <br />Mined Land Reclamation Denver • Grand Junction • Durango Active and Inactive Mines <br />
The URL can be used to link to this page
Your browser does not support the video tag.