My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-03-03_REVISION - M1988112
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1988112
>
2014-03-03_REVISION - M1988112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:40:38 PM
Creation date
3/4/2014 8:47:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Revision
Doc Date
3/3/2014
Doc Name
Detailed inspection report TR33
From
Battle Mountain Resources, Inc.
To
DRMS
Type & Sequence
TR33
Email Name
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
at 4.40 hours. At the peak of the PMF the inflow to the tailing impoundment is <br />calculated to be at a rate of 68 percent of the corresponding inflow. <br />4. Peak flow through the culvert at the Drop Structure is estimated to be between 210 cfs <br />and 248 cfs depending on the modeling approach taken. <br />5. The flow volume bypassed is calculated at 244.5 acre -feet, and that discharged into the <br />tailing impoundment from Areas A, B and C would be 199.4 acre -feet. Under this <br />scenario, the total volume entering the impoundment including that from Areas D and E <br />would be 441.7 acre -feet. <br />6. The calculated depth of flow over the abutment at the Drop Structure and at <br />Stations 30 +34 and 38 +43 could otentiall cause erosion at those locations. <br />P Y <br />Such <br />erosion could also change the flow distributions calculated and the resulting volume <br />entering the impoundment. The maximum depths calculated were 3.1 ft at the Drop <br />Structure and at Station 30 +34 and 4.2 ft at Station 38 +43. <br />Figure 17 Overflow at Sta. 4 +50 <br />RE FIVE_D <br />MAR 3 2014 <br />Division of Reclamation, <br />Mining S Safety <br />San Luis Project Miller Geotechnical Consultants <br />Tailing Dam Data Report 33 February 2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.