My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-03-03_REVISION - M1988112
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1988112
>
2014-03-03_REVISION - M1988112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:40:38 PM
Creation date
3/4/2014 8:47:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Revision
Doc Date
3/3/2014
Doc Name
Detailed inspection report TR33
From
Battle Mountain Resources, Inc.
To
DRMS
Type & Sequence
TR33
Email Name
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
For simplicity, HEC-RAS modeling assumed that corresponding flows from each basin, at a <br />given time, entered the ditch at the same time and did not attempt to compensate for lag times. <br />Since the total volume is similar for both evaluations and because the tailing impoundment can <br />hold the entire storm runoff, the storage capacity evaluation within the tailing impoundment <br />should not be significantly affected by the inflow hydrograph methodology utilized. <br />The results of hydrology analysis are presented in Appendix A and include a tabulation of the <br />key results from HydroCAD analysis together with output tables and graphs. <br />4.3.2 HEC -RAS Modeling of South Diversion Ditch and Drop Structure <br />Description of Model <br />Figure 16, which depicts the South Diversion Ditch System, shows topography along the <br />alignment of the Diversion Ditch from downstream of the Plunge Basin (identified as Station <br />0 +00), upstream through the Flip Bucket, the Drop Pipe, the Inlet Acceleration Chute, and then <br />along the South Diversion Ditch upstream to its end at approximately Station 38 +43. Flows <br />from contributing drainage basins enter the system at the following approximate station <br />locations: <br />o Area A at approximately Station 34 +00 <br />o Area B at approximately Station 27 +25 <br />o Area C at approximately Station 11 +55 <br />Cross Sections were developed from topographic mapping at various locations to define the ditch <br />geometry, including changes in alignment (horizontal or vertical), cross sectional geometry, <br />and/or top of bank elevation. Roughness coefficients (Manning's "n ") were estimated based on <br />available field observations and photographs provided from site visits. Locations of potential <br />overflow from the ditch system to either the tailing impoundment area or to the area downstream <br />from the embankment (at the Drop Structure) were determined through trial runs, and lateral <br />overflow structures were inserted in the model to enable modeling of the top of bank as a side <br />channel weir, thereby accounting for losses from the ditch system. A minor constriction of the <br />existing channel exists at around Station 22 +50. For purposes of analysis, modeling assumed <br />removal of that constriction. Key locations of potential overflow from the ditch system to the <br />tailing impoundment area were found to be located at around Station 30 +34, and at the far <br />upstream end of the ditch near Station 38 +43 both as shown on Figure 16. Other very minor <br />overflow locations to the tailing impoundment occur along the south embankment <br />(approximately Station 6 +00 to 23 +00). <br />San Luis Project Miller Geotechnical Consultants <br />Tailing Dam Data Report 29 February 2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.