My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-03-03_REVISION - M1988112
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1988112
>
2014-03-03_REVISION - M1988112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:40:38 PM
Creation date
3/4/2014 8:47:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Revision
Doc Date
3/3/2014
Doc Name
Detailed inspection report TR33
From
Battle Mountain Resources, Inc.
To
DRMS
Type & Sequence
TR33
Email Name
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
curve, 12 -hour storm was used with the storm duration forced to be 8 hours in an effort to best <br />match the original work. Peak flow results for this analysis as compared to the original design <br />analysis are summarized on Table 2: <br />Table 2 PMF Peak Flow Comparisons: Original Desiqn and Current Analvsis <br />Catchment Area <br />Designation <br />Original Design <br />cfs <br />Current Analysis <br />cfs <br />_ Area A <br />4725 <br />2668 <br />Area B <br />2497 <br />1825 <br />Area C <br />1084 <br />1002 <br />Area D <br />1498 <br />1030 <br />Area E <br />1875 <br />909 <br />For purposes of South Diversion Ditch peak flow evaluation only the peaks from Areas A, B and <br />C are relevant. For Areas A through C the ratio of the current evaluation peak flow to the <br />originally computed peak flow varies from 0.56 to 0.92. A review of the original methodology <br />did not enable us to confirm the basis of the earlier peak flow determinations. The values <br />previously derived appear to be overly conservative being both beyond any peak factor option <br />available in HydroCAD and beyond normal peaking factors typically found in the literature. <br />Accordingly the hydrographs derived as part of this review will be used for channel capacity <br />analysis in HEC -RAS modeling. Hydrographs derived are presented in Figure 15. <br />,atltla <br />woa o <br />ima - <br />\soao <br />san a <br />Dtl � <br />tlaa <br />Figure 15 South Diversion Ditch PMF Inflow Hydrographs <br />San Luis Project Miller Geotechnical Consultants <br />Tailing Dam Data Report 28 February 2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.