Laserfiche WebLink
i <br />It was recommended to BMRI by MGC that the exposed liner be removed, replaced, and <br />connected to the old liner where it was not degraded and that the gulley be repaired and surface <br />water drainage be improved to divert water away from the groin area. BMRI completed this task <br />and the work was completed as of Initial Site Inspection in May 2013. The completed work is <br />shown in Figure 7. A new diversion ditch was cut to divert runoff away from the groin in the <br />future. Erosion protection in the re- graded area had not yet been installed at the time of <br />inspection. <br />Figure 7 Initial Site Inspection, Right Abutment Groin <br />Erosion Gulley After Repairs, Looking Downstream from <br />Near Crest <br />San Luis Project Miller Geotechnical Consultants <br />Tailing Dam Data Report 13 February 2014 <br />