Laserfiche WebLink
Table 8 <br />Firestone Gravel Resource (DMG Permit No. M -96 -052) Person Responsible for this plan <br />January 2014 to December 2015 SWSP Accounting Lynn Mayer Shults <br />(all values in acre -feet, unless otherwise noted) 303.286.2247 <br />(1) (2) (3) (4) (5) (6) (7) (6) (9) (10) (11) (12) (13) (14) (15) <br />DEPLETIONS <br />20% <br />MINING DEPLETIONS <br />DEWATERING <br />2,000 <br />Month <br />Aggregate Production <br />Evaporation <br />Dust <br />Control <br />Total Depletions <br />337 gpm <br />NET <br />DEPLETIONS <br />Percent of <br />Excavated <br />Material <br />Total Excavated <br />Material (tons) <br />Material <br />Washed (tons) <br />Material Not <br />Washed (tons) <br />Water <br />Consumed <br />Exposed Area <br />(ac) <br />Net Evap. <br />Rate (ft) <br />Sublmgatlon <br />Credit (ac -ft) <br />Total Evap <br />Not <br />Lagged <br />Lagged <br />Not <br />Lagged <br />Lagged <br />Jan -14 <br />20% <br />-0.15 <br />41 67 <br />0 00 <br />754 <br />000 <br />51% <br />000 <br />-002 <br />000 <br />-077 <br />46.13 <br />-4629 <br />-095 <br />Feb -14 <br />13% <br />-1 51 <br />4613 <br />0.00 <br />754 <br />000 <br />9 4 % <br />000 <br />-001 <br />000 <br />-0.39 <br />41 67 <br />- 45.57 <br />-431 <br />Mar -14 <br />51% <br />-2.58 <br />44.64 <br />0 00 <br />754 <br />-0 12 <br />96% <br />-091 <br />-005 <br />-091 <br />-0.32 <br />46.13 <br />-4435 <br />1.41 <br />Apr-14 <br />94% <br />-3 18 <br />-1 94 <br />46.13 <br />0.00 <br />754 <br />-020 <br />0.03 <br />-1 47 <br />-009 <br />-1 47 <br />-0.68 <br />44.64 <br />-44.92 <br />-1.05 <br />May-14 <br />96% <br />-419 <br />4464 <br />0 00 <br />754 <br />-028 <br />008 <br />-205 <br />-010 <br />-205 <br />-115 <br />46.13 <br />-45.03 <br />-0 15 <br />Jun -14 <br />10.5 % <br />28,926 <br />21,694 <br />7,231 <br />-074 <br />754 <br />-041 <br />012 <br />-2 95 <br />-011 <br />-370 <br />-1.83 <br />44.64 <br />-45.34 <br />-263 <br />Jul -14 <br />99% <br />27,273 <br />20,455 <br />6,818 <br />-0.70 <br />754 <br />-046 <br />0.14 <br />-333 <br />-010 <br />-403 <br />-2.78 <br />46.13 <br />-45.24 <br />1 99 <br />Aug-14 <br />103% <br />28,375 <br />21,281 <br />7,094 <br />-073 <br />754 <br />-0.39 <br />012 <br />-285 <br />-010 <br />-3.58 <br />-3.34 <br />46.13 <br />-45.65 <br />-2.96 <br />Sep-14 <br />157% <br />43,251 <br />32,438 <br />10,813 <br />-1 11 <br />754 <br />-027 <br />008 <br />-1.92 <br />-0.16 <br />-303 <br />-3.39 <br />4464 <br />-4568 <br />-4.59 <br />Oct -14 <br />122% <br />33,609 <br />25,207 <br />8,402 <br />-087 <br />754 <br />-0 15 <br />003 <br />-1 11 <br />-012 <br />-1 97 <br />-3.07 <br />4613 <br />-45.41 <br />-247 <br />Nov -14 <br />10 6 °/ <br />29,201 <br />21,901 <br />7,300 <br />-0 75 <br />754 <br />-009 <br />1000% <br />-071 <br />-011 <br />-1 46 <br />-2.47 <br />44.64 <br />-4552 <br />-345 <br />Dec -14 <br />3.4 % <br />9,366 <br />7,025 <br />2,342 <br />0 24 <br />754 <br />000 <br />000 <br />-003 <br />-0.24 <br />-1.80 <br />46.13 <br />-4533 <br />-1 03 <br />TOTAL 2014 <br />1 1000% <br />1 200,000 <br />1 150,000 <br />1 50,000 <br />-5 15 <br />1 <br />-237 <br />0.60 <br />1 -1729 <br />1 -1 00 <br />1 -22.45 <br />1 -21.99 <br />543.14 <br />- 544.33 <br />-2418 <br />Jan-15 <br />20% <br />9,000 <br />7,000 <br />2,000 <br />-024 <br />754 <br />000 <br />000 <br />-0.02 <br />-024 <br />-1.04 <br />46.13 <br />-4570 <br />-063 <br />Feb -15 <br />1 3% <br />5,850 <br />4,550 <br />1,300 <br />-0 15 <br />754 <br />0.00 <br />000 <br />-001 <br />-0.15 <br />-0.62 <br />41 67 <br />4527 <br />-424 <br />Mar -15 <br />51% <br />22,950 <br />17,850 <br />5,100 <br />-060 <br />754 <br />-0.12 <br />-091 <br />-005 <br />-1 51 <br />-0.58 <br />4613 <br />-4421 <br />1 29 <br />Apr-1 5 <br />9 4 % <br />42,300 <br />32,900 <br />9,400 <br />-1 11 <br />754 <br />-020 <br />003 <br />-1 47 <br />-0.09 <br />-2.58 <br />-1.17 <br />44.64 <br />4485 <br />-1 47 <br />May-1 5 <br />96% <br />43,200 <br />33,600 <br />9,600 <br />-1 13 <br />754 <br />-0.28 <br />008 <br />-205 <br />-010 <br />-3 18 <br />-1 94 <br />46.13 <br />-4500 <br />-091 <br />Jun -15 <br />105% <br />47,250 <br />36,750 <br />10,500 <br />-1 24 <br />754 <br />-0.41 <br />012 <br />-2.95 <br />-0 11 <br />-419 <br />-2.70 <br />4464 <br />-4532 <br />-348 <br />Jul -15 <br />99% <br />44,550 <br />34,650 <br />9,900 <br />-1 17 <br />754 <br />-0.46 <br />014 <br />-3.33 <br />-0 10 <br />449 <br />-347 <br />4613 <br />4523 <br />-2.67 <br />Aug-1 5 <br />103% <br />46,350 <br />36,050 <br />10,300 <br />-1 21 <br />754 <br />-039 <br />012 <br />-2.85 <br />-010 <br />-406 <br />-3.92 <br />4613 <br />-4565 <br />-354 <br />Sep-1 5 <br />15.7% <br />70,650 <br />54,950 <br />15,700 <br />-1 85 <br />754 <br />-027 <br />008 <br />-1 92 <br />-016 <br />-377 <br />-396 <br />4464 <br />4568 <br />-5 16 <br />Oct -15 <br />122% <br />54,900 <br />42,700 <br />12,200 <br />-1 44 <br />754 <br />-0,15 <br />0.03 <br />-1.11 <br />-012 <br />-254 <br />-3.69 <br />4613 <br />-4541 <br />-309 <br />Nov -15 <br />106% <br />47,700 <br />37,100 <br />10,600 <br />-1 25 <br />754 <br />-0.09 <br />-0.71 <br />-011 <br />-1 96 <br />-306 <br />44.64 <br />-4552 <br />-404 <br />Dec -15 <br />34% <br />15,300 <br />11,900 <br />3,400 <br />-040 <br />7 54 <br />0 00 <br />0.00 <br />-003 <br />-040 <br />-229 <br />4613 <br />-4533 <br />-1.52 <br />TOTAL 2015 <br />1000% <br />450,000 <br />350,000 <br />100,000 <br />-11 77 <br />2 37 <br />0.60 <br />-17.29 <br />-1 00 <br />-2907 <br />-2844 <br />54314 <br />- 543.17 <br />-2947 <br />Notes <br />1 Percent of excavated material based on historical operations at permit area - Accounting values based on measurements of actual tonnage. <br />2. Total excavated material of 200000 tons in 2014 and 450000 tons in 2015, distributed per (1). <br />3. and 4 Projected tons of material washed and not washed based on historical operations at permit area. Actual recorded values to be used in SWSP accounting <br />5 Equal to 4% of washed material (3) + 2% of material not washed (4). <br />6. Exposed surface area outside of lined areas <br />7 Net evaporation based on gross evaporation (NOAA NWS -33) less 70% of average precipitation Set to zero formonths with average mean temperature less than 32 degrees <br />8 Historical subirngahon credit at site - From previous historical subimgation credit analysis Accounting values based on measurements of actual ice cover. <br />9, Equal to (6)' (7) + (8) <br />10. 0 ac -ft In 2014 and 0 ac -ft in 2015 Distributed based on (1), and Included as part of dewatenng (13) <br />11 Equal to (5) + (9) <br />12 Equal to unlagged mining depletions (11), lagged back to St Vraln Creek using AWAS program with following aquifer parameters X =2210 ft, W =2262 ft, T =72300 gpd /ft, and S =0 2. <br />13 Based on 2013 pumping of 337 gpm, on average, recorded at site, <br />14 Equal to unlagged dewatenng pumping (13), lagged back to St Vrain Creek using AWAS program with following aquifer parameters X =2210 ft, W =2262 ft, T =72300 gpd /ft, and S =0.2 <br />15 Equal to (12) + (13) + (14) + (10), since dust control comes from dewatenng pumping that does not return to the river <br />Negative values ( -) represent net depletions to river system Positive values ( +) represent net accretions to river system <br />Cook \ParaomWatn \lGEVn,II \SWSP ILYS \t°Eve„slP,liummar V201a N1S SWSheq 12°131127 <br />Wwk1Cee1 F-11. <br />11/26/2°13 9 °! A'n <br />� <br />m <br />m; <br />C mm <br />� <br />O <br />CrS <br />c <br />In <br />C v <br />