Laserfiche WebLink
Table 7 <br />Rinn Valley Resource (DMG Permit No. M -97 -093) <br />January 2014 to December 2015 SWSP Accounting <br />(all values in acre -feet, unless otherwise noted) <br />Person Responsible for this plan <br />Lynn Mayer Shults <br />303 2B6 2247 <br />(1) (2) (3) (4) (5) (6) (7) (6) (9) (10) (11) (12) (13) (14) (15) (16) (17) <br />DEPLETIONS <br />Jan-15 <br />3.7% <br />21,460 <br />18,500 <br />2,960 <br />-0.59 <br />610 <br />0.00 <br />-0.02 <br />0.0% <br />0.00 <br />-0.59 <br />-105 <br />34.93 <br />-3486 <br />-1.00 <br />Feb -15 <br />5.0% <br />29,000 <br />25,000 <br />4,000 <br />-0.79 <br />610 <br />0.00 <br />-0.01 <br />0.0% <br />0.00 <br />-0.79 <br />-1.01 <br />3155 <br />-32.90 <br />-237 <br />Mar -15 <br />12.7% <br />73,660 <br />63,500 <br />10,160 <br />-2.02 <br />6.10 <br />-0.12 <br />-0.72 <br />-005 <br />55% <br />4,675 <br />-0.72 <br />-274 <br />-2.10 <br />34.93 <br />-34.18 <br />-212 <br />Apr-15 <br />99% <br />57,420 <br />49,500 <br />7,920 <br />-1.57 <br />610 <br />-0.20 <br />-1.22 <br />-0.09 <br />90% <br />7,650 <br />-1.17 <br />-2.79 <br />-2.49 <br />33.80 <br />-34.03 <br />-3.98 <br />May-15 <br />96% <br />55,680 <br />48,000 <br />7,680 <br />-1 53 <br />6.10 <br />-0.26 <br />-1.57 <br />-010 <br />13.0% <br />11,050 <br />-1.70 <br />-310 <br />-2.77 <br />34.93 <br />-34.53 <br />-416 <br />Jun -15 <br />126% <br />73,080 <br />63,000 <br />10,080 <br />-200 <br />6.10 <br />-038 <br />-2.34 <br />-0.11 <br />165% <br />14,025 <br />-2.15 <br />-434 <br />-3 63 <br />3380 <br />-34.09 <br />-617 <br />Jul -15 <br />8.4% <br />48,720 <br />42,000 <br />6,720 <br />-1 34 <br />6.10 <br />-0.44 <br />-2.66 <br />-010 <br />180% <br />15,300 <br />-235 <br />-399 <br />-375 <br />3493 <br />-3457 <br />-584 <br />Aug-15 <br />8.3% <br />48,140 <br />41,500 <br />6,640 <br />-1.32 <br />610 <br />-0.38 <br />-2.31 <br />-0.10 <br />15.0% <br />12,750 <br />-1.96 <br />-363 <br />-3.58 <br />34.93 <br />-34.77 <br />-5.48 <br />Se 15 <br />9.3% <br />53,940 <br />46,500 <br />7,440 <br />-1 48 <br />610 <br />-026 <br />-1.60 <br />-016 <br />11.0% <br />9,350 <br />1 43 <br />-308 <br />-3.24 <br />3380 <br />-34.16 <br />-5.19 <br />Oct -15 <br />6.5% <br />37,700 <br />32,500 <br />5,200 <br />1 03 <br />610 <br />-0.18 <br />-1.13 <br />-012 <br />8.0% <br />6,800 <br />-1 04 <br />-2 16 <br />-2.61 <br />34.93 <br />-34.62 <br />-346 <br />Nov -15 <br />8.8% <br />51,040 <br />44,000 <br />7,040 <br />-1.40 <br />610 <br />-0.09 <br />-057 <br />-0.11 <br />4.0% <br />3,400 <br />-052 <br />-1 97 <br />-2 28 <br />33.80 <br />-34.15 <br />-3.25 <br />Dec -15 <br />5.2% <br />30,160 <br />26,000 <br />4,160 <br />-083 <br />610 <br />0.00 <br />-0.03 <br />1 0.0% <br />000 <br />-0.83 <br />-1.50 <br />34.93 <br />-34.61 <br />-1.21 <br />TOTAL 2015 <br />100.0% <br />580,000 <br />500,000 <br />80,000 <br />-1589 <br />7_31 <br />-14.12 <br />-1.00 <br />1 100.0% <br />85,000 <br />-13.04 <br />-30.01 <br />-3001 <br />411.28 <br />- 411.47 <br />-44.24 <br />Notes <br />1 Percent of excavated material based on historical operations at permit area - Accounting values based on measurements of actual tonnage <br />2 Total excavated material of 580000 tons in 2014 and 580000 tons in 2015, distributed per (1). <br />3 and 4. Projected tons of material washed and not washed based on historical operations at permit area Actual recorded values to be used in SWSP accounting. <br />5 Equal to 4% of washed material (3) + 2% of material not washed (4) <br />6. Exposed surface area outside of lined areas <br />7. Net evaporation based on gross evaporation (NOAA NWS -33) less 70% of average precipitation (see Table 16) Set to zero for months with average mean temperature less than 32 degrees <br />8 Equal to (6) ` (7), Accounting values based on measurements of actual ice cover. <br />9 1 ac -ft in 2014 and 1 ac -ft in 2015. Distributed based on (1), and included as part of dewatering (15) <br />10 Percent of concrete production based on historical operations at permit area: Accounting values based on measurements of actual production. <br />11. Total concrete production of 85000 cubic yards in 2014 and 85000 cubic yards in 2015, distributed per (1) <br />12 Equal to (11) - 50 gallons per cubic yard / 325851, and included as part of dewatenng (15). <br />13 Equal to (5) + (8) Dust control (9) and water used for concrete production (12) comes from pumping for dewatering (15) Therefore, the water for dust control and concrete production are removed from the dewatering amount returned to river, as <br />calculated in the net depletions (17) <br />14. Equal to unlagged mining depletions (13) since operations started in 1997, lagged back to St. Wain Creek using AWAS program with following aquifer parameters X =715 ft; W =4173 ft, T= 125000 gpd/ft, and S =0.2. <br />15. Based on 2013 pumping of 255 gpm, on average, recorded at site <br />16. Equal to unlagged dewatering pumping (15) since operations started in 1997, lagged back to St Vrain Creek using AWAS program with following aquifer parameters X =715 ft; W =4173 ft; T= 125000 gpd /ft, and S =0 2. D m <br />17 Equal to (14) + (15) + (16) + (9) + (12), since dust control and concrete water comes from dewatering pumping that does not return to the river -4 ;a <br />Negative values ( -) represent net depletions to nver system Positive values ( +) represent net accretions to river system :7 T A <br />W4600F'Clpvwnt k1 \LGEV .1t \S Pd.1VGf,e P11SU g201120155WSPreq ,t 31127 <br />11/3 ." I PM <br />04?0 <br />M n <br />Ch <br />1�r't <br />d"L <br />s.e. <br />Cdr <br />N <br />M <br />0 <br />M <br />4- <br />