Laserfiche WebLink
February 25, 2014 C- 1982 - 056 /Foidel Creek Mine JDM <br />stable with soil placed and the out -slope of the second bench is stable. The construction of the east perimeter ditch <br />is on- going. Two of the three piezometers have been installed. <br />RDA Expansion toe to Pit Pond and the first bench <br />Compacted and Dry Processing Waste <br />Number of Partial Inspection this Fiscal Year: 6 <br />Number of Complete Inspections this Fiscal Year: 2 <br />Page 3 of 5 <br />