Laserfiche WebLink
O <br />O <br />C.5 <br />00�\i <br />ooX <br />90 <br />i• <br />00 +0�� <br />O <br />O <br />r <br />O <br />OO <br />O\\ <br />k <br />O <br />O <br />M <br />O <br />O <br />0 <br />0 <br />+ <br />DO <br />LLI <br />O� <br />O� <br />r" LEGEND: <br />EXISTING GROUND SURFACE CONTOUR AND EL, f—f <br />PROPOSED GROUND SURFACE CONTOUR EL, FEET <br />EXISTING UNIMPROVED ROAD/TRAILS <br />EXISTING IMPROVED ROADWAYS <br />EXISTING DRAINAGES <br />n PREVIOUSLY DEPLOYED LINER <br />r� 4 <br />DEPLOYED LINER <br />NOTES: <br />APPROXIMATELY 58,433 SQUARE FEET OF PRIMARY 80 MIL GEOMEMBRANE DEPLOYED <br />DURING WEEK <br />/ APPROXIMATELY 3,234,289 SQUARE FEET OF GEOMEMBRANE DEPLOYED TO DATE <br />1 J <br />/O <br />_ O <br />/ + , <br />O <br />wl <br />O <br />O <br />�f <br />N <br />LU <br />"E "T CRIPPLE CREEK & VICTOR <br />GOLD MINING COMPANY <br />+ PROJECT <br />PHASE 5 VLF <br />s <br />TITLE <br />PHASE 5 GEOMEMBRANE INSTALLATION <br />C) PSSA PRIMARY 80 MIL <br />N DESIGNED BY CMT CHECKED BY JDH DATE <br />anec—, DRAWN BY CMT APPROVED BY JOH 10/02/ <br />EARTH AND ENVIRONMENTAL- CADD FILENAME FIGURE No. I REV <br />O r <br />_ 3a 0 <br />