Laserfiche WebLink
80 "r <br />O <br />O <br />01 10 <br />i <br />00 +010 <br />O <br />O <br />k <br />N <br />r <br />C� <br />Y <br />LEGEND: <br />EXISTING GROUND SURFACE CONTOUR AND EL, FEET <br />PROPOSED GROUND SURFACE CONTOUR EL, FEET <br />EXISTING UNIMPROVED ROAD/TRAILS <br />N <br />EXISTING IMPROVED ROADWAYS <br />EXISTING DRAINAGES <br />0 <br />SOIL LINER FILL PLACEMENT <br />0 <br />PREVIOUS SOIL LINER FILL PLACEMENT <br />CLIENT CRIPPLE CREEK & VICTOR <br />GOLD MINING COMPANY <br />PROJECT <br />PHASE 5 VLF <br />TITLE <br />PHASE 5 SOIL LINER FILL <br />PLACEMENT <br />DESIGNED BY CUT CHECKED BY JON DATE <br />an*& DRAWN BY I CMT I APPROVED BY JDH 10/02/10 <br />EARTH AND ENVIRONMENTAL CADO FKENAME FIGURE No. REV <br />__ _ 2 0 <br />