My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-08-26_REPORT - M1980244 (28)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2011-08-26_REPORT - M1980244 (28)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:42:42 PM
Creation date
2/27/2014 9:38:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
8/26/2011
Doc Name
Final Report QA 2011 Phase 5 VLF Ore Storage Aug 26, 2011 vol 1 of 3
From
CC&V
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ameO <br />1.0 INTRODUCTION <br />The Cripple Creek & Victor Gold Mining Company (CC &V) currently operates the Cresson <br />Project, located in Teller County, Colorado, near the city of Victor on Colorado State <br />Highway 67. CC &V is owned and managed by Anglogold Ashanti (Colorado) Corp. <br />( Anglogold Ashanti). The Cresson Project is a mining and ore processing facility which is <br />comprised of surface mines, crushers, a lined Valley Leach Facility (VLF), gold recovery <br />plant, and associated infrastructure, all of which were designed and constructed to meet or <br />exceed the requirements established by C.R.S. §34 -32 -101 et seq. and regulations <br />promulgated there under by the Mined Land Reclamation Board (MLRB). The work <br />associated with the Cresson Project is being performed under specific criteria established in <br />Amendment No. 9 of Permit Number M- 1980 -244 (Permit), as approved by the MLRB. This <br />report documents the Construction Quality Assurance (CQA) and Construction Quality <br />Control (CQC) services provided by AMEC Earth and Environmental (AMEC) from January <br />2009 through August 2011 for the 2011 Phase 5 Valley Leach Facility Ore Storage Area <br />(OSA) 2 d Portion, which is defined in Section 1.6. The general site plan is presented on <br />Figure 1, and the certification boundaries are presented on Figure 2. <br />1.1 Project Description <br />The initial Cresson Project was designed in 1993 and constructed in phases since 1994 <br />under Amendment Nos. 6, 7, 8, and 9 to Mining Permit M- 1980 -244. This certification report <br />addresses the addition of approximately 1,390,253 square feet plan area of a portion of the <br />earthen and synthetically -lined Phase 5 Ore Storage Area (OSA). This area is referred to as <br />the 2011 Phase 5 VLF OSA 2nd Portion, and was designed to meet the criteria presented <br />and approved in Amendment No. 9. <br />Ames Construction Inc. (Ames) of Aurora, Colorado, was the earthworks contractor for the <br />2011 Phase 5 VLF OSA 2nd Portion. Ames performed construction activities for the Project <br />from January 2009 through August 2011. Poly -Flex of Grand Prairie, Texas, manufactured <br />the geomembrane used to construct the 2011 Phase 5 VLF OSA 2nd Portion. Lone Star <br />Lining Company (Lone Star) of Arlington, Texas, completed the installation of geomembrane <br />AMEC Earth & Environmental, Inc <br />2000 S. Colorado Blvd 2 -1000 <br />Denver, CO 80222 <br />Tel 303 - 935 -6505 <br />Fax 303 - 935 -6575 www amec com <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.