My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-08-26_REPORT - M1980244 (28)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2011-08-26_REPORT - M1980244 (28)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:42:42 PM
Creation date
2/27/2014 9:38:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
8/26/2011
Doc Name
Final Report QA 2011 Phase 5 VLF Ore Storage Aug 26, 2011 vol 1 of 3
From
CC&V
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AM <br />"40M <br />5.0 GEOSYNTHETICS QC SUBMITTALS <br />Geosynthetics QC submittals reviewed by AMEC included installation personnel resumes, <br />geomembrane resin certificates, geomembrane roll certificates, welding rod certificates, and <br />geotextile certificates. AMEC's inventory control, summarizing QC certification received for <br />each roll of geomembrane received for the 2011 Phase 5 VLF OSA 2nd Portion primary liner <br />system, is presented in Appendix 1 -1. All geosynthetic material used as part of the 2011 <br />Phase 5 VLF OSA 2nd Portion construction met project specifications. <br />5.1 Geomembrane Installation Personnel Resumes <br />AMEC reviewed the resumes of Lone Star installation personnel to verify that the installation <br />superintendent and the seaming personnel possessed sufficient experience as required by <br />the project specifications. Review of the installation personnel resumes indicated that key <br />personnel had experience sufficient to meet or exceed project specifications. <br />Geomembrane personnel resumes are presented in Appendix 1 -2. <br />5.2 Geomembrane QC Documents <br />QC documents submitted by Lone Star included resin supplier certificates and <br />geomembrane manufacturer resin certificates, geomembrane roll certificates, and welding <br />rod certificates. AMEC reviewed QC documents prior to geomembrane placement and <br />verified that the documentation was complete and that the material properties and QC <br />testing frequency required by the specifications were met. <br />5.2.1 Resin QC Certificates <br />LLDPE polymer raw material (resin) QC certificates were provided by the resin <br />manufacturer, Chevron Phillips Chemical Company, at a frequency of one per rail car <br />shipment. AMEC reviewed these certificates prior to geomembrane placement. <br />Geomembrane used on this project was produced from twenty -eight batches of resin. The <br />geomembrane manufacturer also performed density and melt index tests of the resin <br />AMEC Earth & Environmental, Inc. <br />2000 S. Colorado Blvd 2 -1000 <br />Denver, CO 80222 <br />Tel 303 - 935 -6505 <br />Fax 303 - 935 -6575 www.amec com <br />24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.