My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-08-26_REPORT - M1980244 (28)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2011-08-26_REPORT - M1980244 (28)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:42:42 PM
Creation date
2/27/2014 9:38:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
8/26/2011
Doc Name
Final Report QA 2011 Phase 5 VLF Ore Storage Aug 26, 2011 vol 1 of 3
From
CC&V
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ameO <br />4.0 EARTHWORK CQA TESTING AND MONITORING <br />The following sections summarize results of the earthwork CQA testing and monitoring <br />performed by AMEC for the 2011 Phase 5 VLF OSA 2nd Portion . <br />AMEC conducted CQA testing of earthwork materials used for construction. AMEC <br />performed CQA testing of in -place materials used for construction of the 2011 Phase 5 VLF <br />OSA 2nd Portion. Table 4 presents specified and observed CQA testing frequencies. <br />Figure 1 shows the site plan and coordinate system used to locate tests. <br />In accordance with the AMEC CQA Plan, when an AMEC monitor observed deficiencies, the <br />monitor determined the nature and extent of the problem and notified Ames and /or CC &V. <br />When unsatisfactory test results identified a deficiency, AMEC performed additional tests to <br />define the extent of the deficient area. Ames corrected deficiencies to meet the <br />requirements of the specifications, and AMEC retested and /or approved the corrected <br />deficiency prior to any additional related work. The following sections include discussions of <br />the deficiencies encountered. <br />4.1 Results of Laboratory Soils Testing <br />AMEC performed laboratory testing of soils during all aspects of the 2011 Phase 5 VLF OSA <br />2nd Portion construction. AMEC's on -site soils laboratory at CC &V performed all of the <br />material testing. To verify that the earthwork materials used during construction met project <br />specifications, AMEC performed the following American Society for Testing and Materials <br />(ASTM) tests: <br />• Rock corrected density values (ASTM D4718); <br />• Grain size distribution (ASTM D1140 for material finer than the No. 200 <br />sieve, and ASTM C117 and C136 for coarse material); <br />• Moisture content (ASTM D2216); <br />• Atterberg limits (ASTM D4318); <br />AMEC Earth & Environmental, Inc. <br />2000 S Colorado Blvd 2 -1000 <br />Denver, CO 80222 <br />Tel 303 - 935 -6505 <br />Fax 303 - 935 -6575 www.amec com <br />16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.