Laserfiche WebLink
WTI I=, I <br />• Caterpillar 14G Motor - Grader; <br />• Caterpillar CS563 Compactor; <br />• John Deere 35D Excavator; <br />• Caterpillar 312 Excavator; <br />• Komatsu 300 Excavator; <br />• John Deere 200 Excavator; <br />• Caterpillar 320 Excavator; <br />• Caterpillar 330 Excavator; <br />• Caterpillar 345 Excavator; <br />• Caterpillar 375 Excavator; <br />• John Deere 850 Excavator; <br />• Caterpillar 735 Haul Truck; <br />• Caterpillar 740 Haul Truck; <br />• Caterpillar 777 Haul Truck; and <br />• Water Trucks. <br />Weather data for the 2011 Phase 5 VLF OSA 2 I Portion construction activities from the <br />period of January 2009 through August 2011 are presented in Table 2. <br />2.1 Underground Workings Remediation <br />Historic underground workings were not encountered within the footprint of the 2011 Phase <br />5 VLF OSA 2rid Portion documented in this report. As such, no remediation of underground <br />workings was required. <br />AMEC Earth & Environmental, Inc. <br />2000 S Colorado Blvd 2 -1000 <br />Denver, CO 80222 <br />Tel 303 - 935 -6505 <br />Fax 303 - 935 -6575 www.amec.com <br />8 <br />