My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-11-19_REPORT - M1980244 (5)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2011-11-19_REPORT - M1980244 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:45:10 PM
Creation date
2/26/2014 3:31:35 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
11/19/2011
Doc Name
FINAL REPORT, VOLUME 3 OF 3 2011 phase 5 valley leach facility ore storage 1 OF 2
From
CC&V
To
DRMS
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
403
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
amec <br />CC &V. Off road haul truck traffic shall require a minimum of 60 inches for Cat 773 (or <br />equivalent) of Low Volume Solution Collection Fill placed over the geomembrane and <br />solution collection piping, and a minimum of 120 inches for CAT 777 (or equivalent) of <br />Low Volume Solution Collection Fill placed over the geomembrane and solution collection <br />piping. <br />When placing Low Volume Solution Collection Fill the maximum acceptable drop height is <br />3 feet. <br />8. CONTRACTOR shall operate equipment in a manner that is protective of underlying <br />geosynthetics. If MANAGER or CERTIFYING ENGINEER suspects the occurrence of <br />any damage to the underlying geosynthetics, MANAGER will instruct CONTRACTOR to <br />remove Low Volume Solution Collection Fill to expose the geosynthetics. <br />CONTRACTOR shall uncover, repair any observed damage of the underlying <br />geosynthetics, in accordance with the repair requirements of Sections 02776.0 and 02777.0 <br />of these SPECIFICATIONS, and recover, at no cost to CC &V. <br />9. CONTRACTOR shall place Low Volume Solution Collection Fill at a rate such that no <br />single area of 350,000 square feet of geomembrane liner is exposed to ultraviolet light for <br />more than 180 days. <br />10. CONTRACTOR shall provide close continuous monitoring at the point of placement <br />during the placement of the Low Volume Solution Collection Fill over geosynthetics. <br />11. CONTRACTOR shall verify the final thickness of Low Volume Solution Collection Fill to <br />determine compliance with this SPECIFICATION. CONTRACTOR shall record <br />verification location, elevation, and thickness. CQA Monitor shall witness all verification <br />measurements. CONTRACTOR will submit a method of verifying Low Volume Solution <br />Collection Fill depth to MANAGER for approval. Grade markers shall be placed on a 50- <br />by-50- foot grid with additional points required for breaks in grade. CONTRACTOR shall <br />remove all grade markers under supervision of CQA Monitor after verification <br />measurements have been approved by MANAGER and CERTIFYING ENGINEER and <br />will backfill holes with Low Volume Solution Collection Fill. Areas with deficient thickness <br />shall be reworked by CONTRACTOR, until acceptable measurements are obtained. If <br />MANAGER or CERTIFYING ENGINEER suspects the occurrence of any damage to the <br />underlying geosynthetics, MANAGER will instruct CONTRACTOR to remove Low <br />Volume Solution Collection Fill to expose the geosynthetics. CONTRACTOR shall <br />uncover, repair any observed damage of the underlying geosynthetics, in accordance with <br />the repair requirements of Sections 02776.0 and 02777.0 of these SPECIFICATIONS and <br />recover, at no cost to CC &V. <br />12. CONTRACTOR will provide adequate illumination as approved by MANAGER, if Low <br />Volume Solution Collection Fill placement is carried out at night. A minimum of 2 -foot <br />candles measured at the synthetic liner, shall be used when Low Volume Solution Collection <br />Fill placement is carried out at night. <br />G. Soil Liner Fill <br />Soil Liner Fill shall be placed within the limits of the valley leach facility as shown on the <br />DRAWINGS and shall begin only after completion of all, or MANAGER and <br />CERTIFYING ENGINEER approved portion of, excavation and Structural Fill placement <br />in the valley leach facility. <br />Section 02200 Page 12 of 18 September 3, 2008 <br />Earthworks Revision 1 <br />PAPhase 5 OSA 2011 Cert Report\Appendices\Appendix E Spedficationsk02200.rl.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.