My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-11-19_REPORT - M1980244 (5)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2011-11-19_REPORT - M1980244 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:45:10 PM
Creation date
2/26/2014 3:31:35 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
11/19/2011
Doc Name
FINAL REPORT, VOLUME 3 OF 3 2011 phase 5 valley leach facility ore storage 1 OF 2
From
CC&V
To
DRMS
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
403
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ameO <br />4. Provisions shall be made by CONTRACTOR for removal of oversize materials from fills, <br />at no additional cost to CC &V. <br />The MANAGER will minimize the amount of traffic over the Underdrain Fill. <br />E. Leak Detection Fill <br />Leak Detection Fill shall be placed in the Leak Detection Trenches as shown on the <br />DRAWINGS. <br />2. CONTRACTOR shall condition Leak Detection Fill to allow a surface that does not cause <br />rutting or other deleterious effects. <br />F. Low Volume Solution Collection Fill <br />Low Volume Solution Collection Fill shall be placed over the geomembrane in the locations <br />shown on the DRAWINGS. <br />2. CONTRACTOR shall condition Low Volume Solution Collection Fill to allow a surface <br />that does not cause rutting or other deleterious effects. <br />CONTRACTOR shall place Low Volume Solution Collection Fill around the Low Volume <br />Solution Collection Vertical Riser Pipes in maximum 12 -inch loose lifts and compact using <br />a hand operated vibratory plate compactor to the satisfaction of the MANAGER and <br />CERTIFYING ENGINEER. Low Volume Solution Collection Fill shall be worked under <br />the Low Volume Solution Collection Rise pipe haunches by hand to provide uniform <br />support of the pipe. <br />4. Prior to placing the Low Volume Solution Collection Fill, CONTRACTOR shall verify by <br />visual inspection that the underlying geosynthetics are free of holes, tears, wrinkles, or <br />foreign objects. MANAGER and CERTIFYING ENGINEER will inspect the <br />geosynthetic for wrinkles prior to placement of Low Volume Solution Collection Fill. As <br />instructed by MANAGER, CONTRACTOR shall "work out" wrinkles to the satisfaction <br />of MANAGER and CERTIFYING ENGINEER prior to placement of the Low Volume <br />Solution Collection Fill. In all cases, wrinkles shall not be of a size that they could fold back <br />on themselves. Wrinkles greater than one foot shall be removed and repaired by the <br />INSTALLER. <br />CONTRACTOR shall place Low Volume Solution Collection Fill in a single 36 -inch loose <br />lift. The tracked equipment shall operate only over previously placed Low Volume Solution <br />Collection Fill. CONTRACTOR shall not operate equipment directly on geosynthetics. <br />Only a dozer with a ground pressure not exceeding 14.7 psi can be used to place Low <br />Volume Solution Collection Fill. Equipment used for placement will not be allowed to pivot <br />on one track (i.e., no abrupt or sharp turns). There shall be no downhill placement on slopes <br />steeper than 4H:1 V. Material can be placed along contours if buttressed from below. <br />6. Rubber tired construction equipment shall not be allowed to travel over the geomembrane or <br />on top of Solution Collection piping unless a thickness of at least 45 inches of Low Volume <br />Solution Collection Fill has been placed over the geomembrane and on top of Solution <br />Collection piping. The CONTRACTOR will be required to demonstrate to the <br />MANAGER, DESIGN ENGINEER and CERTIFYING ENGINEER that the equipment <br />and procedures used are not detrimental to the geomembrane and piping, at no cost to <br />Section 02200 Page 11 of 18 September 3, 2008 <br />Earthworks Revision 1 <br />PAPhase 5 OSA 2011 Cert Report\Appendices\Appendix E Specifications \02200.r1.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.