My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-11-19_REPORT - M1980244 (5)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2011-11-19_REPORT - M1980244 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:45:10 PM
Creation date
2/26/2014 3:31:35 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
11/19/2011
Doc Name
FINAL REPORT, VOLUME 3 OF 3 2011 phase 5 valley leach facility ore storage 1 OF 2
From
CC&V
To
DRMS
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
403
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
amec <br />• copies of surveyors certificate; <br />• fill temperature monitoring results; <br />• staff schedule summary; <br />■ a description of significant construction problems and the resolution of these problems; <br />■ changes to the DRAWINGS or SPECIFICATIONS and the justification for these changes; <br />■ record drawings, and <br />■ a statement certifying that construction was completed in compliance with the DRAWINGS <br />and SPECIFICATIONS, signed, and sealed by the CERTIFYING ENGINEER registered in <br />the State of Colorado. <br />TABLE 1 <br />SOIL CONSTRUCTION TESTING FREQUENCY' <br />VOLUME PER TEST <br />1. Tests shall be performed at the specified frequency or one per material type, whichever is greater. <br />2. Use the USCS for description and identification (ASTM D2488). <br />3. In -place moisture content. <br />TABLE 2 <br />SOIL CONSTRUCTION TESTING FREQUENCY <br />VOLUME PER TEST' <br />Section 01400.1 Page 8 of 9 September 3, 2008 <br />Earthworks CQA Plan Revision 1 <br />S: \Projects \1125E CCV CQA \I -Tech Specs \01400.1.rl.doc <br />Select <br />Structural <br />Structural <br />Underdrain <br />Test and ASTM <br />Subgrade <br />Fill <br />Fill <br />Fill <br />Designation <br />(c) <br />(c) <br />(c) <br />(c y) <br />Compaction <br />50,000 <br />50,000 <br />50,000 <br />-- <br />(ASTM D698) <br />Particle Size <br />50,000 <br />50,000 <br />50,000 <br />5,000 <br />(ASTM CI 17, C 136, DI 140) <br />Atterberg Limit <br />-- <br />50,000 <br />-- <br />5,000 <br />(ASTM D4318) <br />Moisture Content3 <br />2,000 <br />2,000 <br />2,000 <br />5,000 <br />(ASTM D2216) <br />Nuclear Density <br />2,000 <br />2,000 <br />2,000 <br />-- <br />(ASTM D2922) <br />1. Tests shall be performed at the specified frequency or one per material type, whichever is greater. <br />2. Use the USCS for description and identification (ASTM D2488). <br />3. In -place moisture content. <br />TABLE 2 <br />SOIL CONSTRUCTION TESTING FREQUENCY <br />VOLUME PER TEST' <br />Section 01400.1 Page 8 of 9 September 3, 2008 <br />Earthworks CQA Plan Revision 1 <br />S: \Projects \1125E CCV CQA \I -Tech Specs \01400.1.rl.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.