My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-11-19_REPORT - M1980244 (4)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2011-11-19_REPORT - M1980244 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:45:10 PM
Creation date
2/26/2014 3:20:58 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
11/19/2011
Doc Name
FINAL REPORT, VOLUME 2 OF 3 (continued) 2011 phase 5 valley leach facility ore storage 3 OF 3
From
CC&V
To
Drms
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
483
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
;%* 14 <br />compacted lift. Moisture conditioning of SLF material was performed using a tandem -axel <br />water truck and compaction was achieved using a 10 -ton vibratory smooth drum compactor. <br />Nuclear density testing, moisture verification, and depth checks were performed. All results <br />met or exceeded project specifications. Test locations were surveyed by Ames. <br />E) Low Volume Solution Collection System <br />1) Low Volume Solution Collection Fill ( LVSCF) <br />Finishing of the LVSCF surface continued in front of the geomembrane deployment using a <br />skid steer loader. <br />F) High Volume Solution Collection System <br />1) High Volume Solution Collection Piping <br />Placement of the high volume collection system continued at the DCF placement area shown <br />on Figures 5a and 5b, advancing in front of the placement. CPeP was placed and sandbagged in <br />accordance with design drawings and project specifications. <br />2) Drain Cover Fill (DCF) <br />Drain cover fill (DCF) placement within the Phase 5 VLF continued. DCF was placed in the <br />area show on Figures 5a and 5b. The DCF was hauled from the processing area to the <br />placement area using CAT 740 haul trucks. The DCF was placed in a 2 -foot lift using two <br />CAT D -6 LGP dozers, a CAT D -7 LGP dozer and a CAT D -8 LGP dozer except where haul <br />routes were established. Haul route consisted of five -foot lifts to be spread into 2 -foot lifts <br />later. Laborers were present at all times during placement holding the high volume collection <br />piping in place, removing debris /sandbags, and assisting the dozer operator with lift thickness. <br />All DCF was placed on previously approved primary geomembrane. AMEC field <br />representatives monitored the DCF placement constantly. <br />3) Ore Placement <br />Ore placement near the high volume solution collection continued using a CAT D -8 dozer. The <br />ore was hauled from the leading edge of the Phase IV heap placement using 40 -ton articulating <br />haul trucks loaded by a CAT 385 excavator. <br />II) Storm Water Management <br />A) Best Management Practices <br />Best Management Practices are being observed throughout the VLF Phase 5 Project. <br />III) Material Processing <br />A) Drain Cover Fill Process Area <br />Drain Cover Fill (DCF) was processed during the week. <br />Location <br />This Week <br />Cumulative <br />Comments <br />(tons) <br />(tons) <br />DCF Process <br />37,919 <br />210,997 <br />Total <br />37,919 <br />210,997 <br />VLF Weekly Report WE 10.16.10.13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.