Laserfiche WebLink
G32 +00 <br />ax <br />o° <br />N <br />O <br />O <br />O <br />+ <br />l <br />0 <br />0 <br />0 <br />0 <br />00 <br />N <br />0 <br />NO <br />_ D4+ <br />• <br />I• <br />0 <br />Fell <br />� 00 <br />t <br />ry� <br />O <br />O <br />0 <br />0 <br />co <br />w <br />0 <br />0 <br />Lai <br />I <br />O <br />fl O <br />o <br />N <br />W <br />0 <br />Lo <br />/ <br />nn C7 <br />71A O <br />tp <br />4J <br />O <br />O <br />+ <br />00 <br />w <br />00 <br />O <br />4v <br />O� <br />EO <br />2 /! <br />0 <br />0 <br />�t <br />z <br />0 <br />0 <br />+ <br />N <br />S <br />I'l <br />LEGEND: <br />EXISTING GROUND SURFACE CONTOUR AND EL, FEET <br />PROPOSED GROUND SURFACE CONTOUR EL, FEET <br />EXISTING UNIMPROVED ROAD/TRAILS <br />EXISTING IMPROVED ROADWAYS <br />EXISTING DRAINAGES <br />PREVIOUSLY DEPLOYED LINER <br />i-- -_i DEPLOYED LINER <br />NOTES: <br />APPROXIMATELY 111,245 SQUARE FEET OF PRIMARY 100 MIL GEOMEMBRANE DEPLOYED <br />X DURING WEEK. <br />APPROXIMATELY 2,727,650 SQUARE FEET OF GEOMEMBRANE DEPLOYED TO DATE <br />CENT CRIPPLE CREEK & VICTOR <br />GOLD MINING COMPANY <br />PROJECT <br />PHASE 5 VLF <br />TITLE <br />PHASE 5 GEOMEMBRANE INSTALLATION <br />PSSA PRIMARY 100 MIL <br />DESIGNED BY CMT CHECKED BY JON I DATE <br />ame& DRAWN BY CMT APPROVED BY JON 09/18/1 <br />f ARTH AND ENVIRONMENTAL CADD FILENAME FIGURE N REV <br />c. <br />3 0 <br />