My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-11-19_REPORT - M1980244 (4)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2011-11-19_REPORT - M1980244 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:45:10 PM
Creation date
2/26/2014 3:20:58 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
11/19/2011
Doc Name
FINAL REPORT, VOLUME 2 OF 3 (continued) 2011 phase 5 valley leach facility ore storage 3 OF 3
From
CC&V
To
Drms
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
483
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
G32 +00 <br />ax <br />o° <br />N <br />O <br />O <br />O <br />+ <br />l <br />0 <br />0 <br />0 <br />0 <br />00 <br />N <br />0 <br />NO <br />_ D4+ <br />• <br />I• <br />0 <br />Fell <br />� 00 <br />t <br />ry� <br />O <br />O <br />0 <br />0 <br />co <br />w <br />0 <br />0 <br />Lai <br />I <br />O <br />fl O <br />o <br />N <br />W <br />0 <br />Lo <br />/ <br />nn C7 <br />71A O <br />tp <br />4J <br />O <br />O <br />+ <br />00 <br />w <br />00 <br />O <br />4v <br />O� <br />EO <br />2 /! <br />0 <br />0 <br />�t <br />z <br />0 <br />0 <br />+ <br />N <br />S <br />I'l <br />LEGEND: <br />EXISTING GROUND SURFACE CONTOUR AND EL, FEET <br />PROPOSED GROUND SURFACE CONTOUR EL, FEET <br />EXISTING UNIMPROVED ROAD/TRAILS <br />EXISTING IMPROVED ROADWAYS <br />EXISTING DRAINAGES <br />PREVIOUSLY DEPLOYED LINER <br />i-- -_i DEPLOYED LINER <br />NOTES: <br />APPROXIMATELY 111,245 SQUARE FEET OF PRIMARY 100 MIL GEOMEMBRANE DEPLOYED <br />X DURING WEEK. <br />APPROXIMATELY 2,727,650 SQUARE FEET OF GEOMEMBRANE DEPLOYED TO DATE <br />CENT CRIPPLE CREEK & VICTOR <br />GOLD MINING COMPANY <br />PROJECT <br />PHASE 5 VLF <br />TITLE <br />PHASE 5 GEOMEMBRANE INSTALLATION <br />PSSA PRIMARY 100 MIL <br />DESIGNED BY CMT CHECKED BY JON I DATE <br />ame& DRAWN BY CMT APPROVED BY JON 09/18/1 <br />f ARTH AND ENVIRONMENTAL CADD FILENAME FIGURE N REV <br />c. <br />3 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.