My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-11-19_REPORT - M1980244 (4)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2011-11-19_REPORT - M1980244 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:45:10 PM
Creation date
2/26/2014 3:20:58 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
11/19/2011
Doc Name
FINAL REPORT, VOLUME 2 OF 3 (continued) 2011 phase 5 valley leach facility ore storage 3 OF 3
From
CC&V
To
Drms
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
483
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_i <br />1 ; .ilk. /�� � •, _ . y -• ��. <br />•r�' i <br />vMM, OA <br />00 +0�,q <br />o `\ <br />0 <br />k <br />N <br />r <br />C7 <br />m• <br />O <br />O <br />X <br />0 <br />0 <br />LIM <br />LEGEND: <br />-- -- EXISTING GROUND SURFACE CONTOUR AND EL, FEET <br />PROPOSED GROUND SURFACE CONTOUR EL, FEET <br />EXISTING UNIMPROVED ROAD/TRAILS <br />EXISTING IMPROVED ROADWAYS <br />EXISTING DRAINAGES <br />SOIL LINER FILL PLACEMENT <br />® PREVIOUS SOIL LINER FILL PLACEMENT <br />CLIENT CRIPPLE CREEK & VICTOR <br />GOLD MINING COMPANY <br />PROJECT <br />PHASE 5 VLF <br />TITLE <br />PHASE 5 SOIL LINER FILL <br />PLACEMENT <br />DESIGNED BY GAIT CHECKED BY JDH DATE <br />DRAWN BY CMT APPROVED BY JDH 09 /18/1 <br />EARTH AND ENVIRONMENTAL CADD FILENAME FIGURE No. REV <br />2 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.